My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 10/12/1989
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1989
>
Agenda - Parks and Recreation Commission - 10/12/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 10:16:01 AM
Creation date
11/19/2003 3:26:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
10/12/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL DESIGN CONSIDERATIONS IN CREATING <br /> ARTIFICIAL WETLANDS FOR WILDLIFE <br /> <br />The best solution to maintaining adequate wetland resources is to prevent disturbance <br />to existing natural basins. When this is unavoidable, however, loss of natural <br />wetland basins can be at least partially offset or be compensated for by construction <br />of artificial basins. Based on our review of recent literature on the subject, we <br />recommend that the following general design features be implemented, to the extent <br />possible, when constructing an artificial wetland basin: <br /> <br />1. The wetland basin can be relatively small (0.5 acre), but, if at all possible, <br />should be at least 1.0 acre in size. <br /> <br />2. A variable (rather than an even-sided) shoreline should be constructed if at all <br />possible since it will increase the amount of shoreline per unit area and increase <br />the waterfowl usage by providing isolated areas for feeding and loafing. <br /> <br />3. The bottom contour should be uneven and rolling, which will produce a variable <br />water depth and allow for emergent vegetation growth on shallow areas throughout the <br />basin. Water depth in shallow areas should be about 12-18 inches and about 3-4 feet <br />in the deepest areas. The shoreline area should have a gentle (10:1 to 20:1) slope <br />to provide for adequate vegetative growth, but also can be variable to provide small <br />vegetative "fingers" and open "bays" and thus more edge. Vegetation growing in these <br />shallower areas of the basin should produce vegetative islands and thereby increase <br />interspersion or edge habitat. A 50% open water and 50% vegetation coverage of the <br />wetland (including the emergent vegetation around the shoreline) will provide the <br />greatest species richness and diversity. <br /> <br />4. The wetland should have a good clay seal to prevent leakage. In addition, we <br />recommend that topsoil be placed on the bottom of the basin to provide a more <br />suitable substrate for aquatic vegetation growth, which will quickly establish a <br />detritus food chain and invertebrate abundance. Wetland basins lined-only with clay <br />normally produce less vegetation, fewer invertebrates and lower numbers of waterfowl <br />than those lined with both clay and topsoil. <br /> <br />5. On projects where existing wetlands are unavoidably impacted; when feasible, muck <br />from existing wetlands should be placed in the bottom of the newly-created basin. <br />This would provide the basin with a naturally-occurring seed bank and other material <br />of high organic content. <br /> <br />6. It may be desirable to construct one or two small earthen islands within some <br />newly-created wetland basins to increase diversity and provide an offshore nesting <br />area for waterfowl and other wildlife. <br /> <br />7. After construction, a layer of natural or domestic~hay should be placed on the <br />wetland substrate; this will allow a detritus food chain to become established more <br />rapidly. <br /> <br />8. Re-establishing and maintaining an upland vegetative buffer area around the <br />perimeter of the newly-created wetland basin will provide nesting habitat and help to <br />ensure optimum waterfowl production occurs on these areas. If mowing of the <br />vegenation around the wetland basin is necessary, it should be delayed until after <br />August 1 if at all possible to avoid disturbance to waterfowl, upland game birds and <br />other wildlife, during the nesting season. <br /> <br />Ils <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.