Laserfiche WebLink
Mr. Ron Hetlund <br />Page 2 <br />December 5, 1989 <br /> <br />Outlots A and B comprise 2.5 acres and with the other areas total <br />21.68 acres or 18.9% of the plat, thus not quite meeting the <br />requirements for a P.U.D. (115 x .2 = 23A). The requirements could <br />nearly be achieved by widening the north-south trail right-of-way <br />to 75' and the connecting trail to 35'. This would account for <br />approximately 22.5 acres and be consistent with City trail <br />standards. <br /> <br />It is the developer's responsibility to make required improvements <br />to assure that suitable developable land is provided for trail <br />construction. <br /> <br />It is recommended that park dedication requirements be met by land <br />dedication as generally shown on the P.U.D. submittal with <br />modifications outlined herein. <br /> <br />If you have any questions or comments concerning this submittal, <br />let us know. <br /> <br />Sincerely, <br /> <br />HAKANSON ANDERSON ASSOCIATES, <br /> <br />M~l~a -Otto - - - <br /> / <br />/mlc <br /> <br />cc: <br /> <br />Mark Banwart, Comm. Dev. Dir. <br />Hokanson Construction <br /> 1451 92nd Lane N.E. <br /> Blaine, ~N 55434 <br />Ulteig Engineers <br /> 5201 E. River Road, S308 <br /> Minneapolis, M/~ 55421 <br /> <br />File: RA2:15-123 <br /> <br /> <br />