Laserfiche WebLink
CROSS CIF HOPE <br />LUTHERAN CHURCH <br />April 2, 2013 <br />Chris Anderson <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Extension of Improvement Deadline <br />Dear Chris, <br />5730 179th Lane NW <br />Ramsey, MN 55303 <br />Ph. #763-753-2057 <br />Please be advised that Cross of Hope would like to request an extension of it's current improvement deadline, <br />of June 15, 2013, to June 15, 2014. <br />The reason for the request is the pending litigation with our contractor. We have established that the parking <br />lot does not meet the original plan and does not function as was designed; therefore we will have an <br />engineered plan created that is the intent of the original plan within the elevations available. Work on the <br />parking lot will have probable impact on the sidewalks and the landscaping in front and we would like to avoid <br />repeating work and/or disturbing areas newly planted. <br />This request is only related to the improvements in the direct front of the building of landscape trees, shrubs, <br />and perennials that fall within 25 feet of the west end of the parking lot. Other unfinished requirements, <br />which include erosion control to disturbed areas south of the parking lot, the in -filled area in the back of the <br />property, as well as the work necessary in the courtyard space (remove the old blacktop, regrade, add black <br />dirt, and add sod/seed), will be completed as planned. All other requirements related to tree planting and <br />erosion control have been completed. <br />Please let Ginger Miliner know if you have requests of us in this regard. <br />Sincerely, <br />Deb Meyer <br />Council President <br />CC: Scott Solberg, Ginger Miliner, James Strommen <br />