My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/23/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 04/23/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:13:28 AM
Creation date
6/18/2013 3:25:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/23/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM Signalized Intersection Capacity Analysis Scenario: AM Future w Proj (Mitigated) <br />24: Sunwood DR & Industry Ave Timing Plan: AM Peak <br />Movement MIL <br />Lane Configurations <br />Ideal Flow (vphpl) <br />Total Lost time (s) <br />Lane Util. Factor <br />Frt <br />Flt Protected <br />Satd. Flow (prot) <br />Flt Permitted <br />Satd. Flow (perm) <br />Volume (vph) <br />Peak -hour factor, PHF <br />Adj. Flow (vph) <br />Lane Group Flow (vph) <br />Turn Type <br />Protected Phases <br />Permitted Phases <br />Actuated Green, G (s) <br />Effective Green, g (s) <br />Actuated g/C Ratio <br />Clearance Time (s) <br />Vehicle Extension (s) <br />Lane Grp Cap (vph) <br />v/s Ratio Prot <br />v/s Ratio Perm <br />v/c Ratio <br />Uniform Delay, d1 <br />Progression Factor <br />Incremental Delay, d2 <br />Delay (s) <br />Level of Service <br />Approach Delay (s) <br />Approach LOS <br />1- <br />I <br />4/ <br />EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />4 r <br />1900 1900 1900 <br />4.0 4.0 <br />1.00 1.00 <br />1.00 0.85 <br />1.00 1.00 <br />1863 1583 <br />1.00 1.00 <br />1863 1583 <br />0 19 48 <br />0.92 0.92 0.92 <br />0 21 52 <br />0 21 52 <br />Perm pm+ov <br />4 5 <br />4 4 8 <br />3.0 11.6 <br />3.0 11.6 <br />0.06 0.22 <br />4.0 4.0 <br />3.0 3.0 <br />105 463 <br />0.01 0.02 <br />0.01 <br />0.20 0.11 <br />24.0 16.7 <br />1.00 1.00 <br />0.9 0.1 <br />24.9 16.8 <br />C B <br />19.2 <br />B <br />Intersection Summary <br />HCM Average Control Delay <br />HCM Volume to Capacity ratio <br />Actuated Cycle Length (s) <br />Intersection Capacity Utilization <br />c Critical Lane Group <br />Ramsey AUAR <br />03/24/2003 <br />MEYERMMINN-SX51 <br />11.8 <br />0.47 <br />53.3 <br />46.2% <br />1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />4.0 4.0 4.0 4.0 4.0 <br />1.00 1.00 1.00 1.00 1.00 <br />0.97 1.00 1.00 1.00 1.00 <br />1.00 0.95 1.00 0.95 1.00 <br />1802 1770 1863 1770 1862 <br />1.00 0.95 1.00 0.95 1.00 <br />1802 1770 1863 1770 1862 <br />0 35 11 147 161 0 12 419 1 <br />0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 <br />0 38 12 160 175 0 13 455 1 <br />0 50 0 160 175 0 13 456 0 <br />Perm Prot Prot <br />8 5 2 1 6 <br />3.0 8.6 37.6 0.7 29.7 <br />3.0 8.6 37.6 0.7 29.7 <br />0.06 0.16 0.71 0.01 0.56 <br />4.0 4.0 4.0 4.0 4.0 <br />3.0 3.0 3.0 3.0 3.0 <br />101 286 1314 23 1038 <br />c0.03 c0.09 0.09 0.01 c0.24 <br />0.50 0.56 0.13 0.57 0.44 <br />24.4 20.6 2.6 26.1 6.9 <br />1.00 1.00 1.00 1.00 1.00 <br />3.8 2.4 0.0 28.1 0.3 <br />28.2 23.0 2.6 54.3 7.2 <br />C C A D A <br />28.2 12.3 8.5 <br />C B A <br />HCM Level of Service <br />Sum of lost time (s) <br />ICU Level of Service <br />12.0 <br />A <br />Page 9 <br />Meyer, Mohaddes Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.