My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 05/28/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:15:24 AM
Creation date
6/19/2013 2:42:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Page 7 of 11 <br />Notification: <br />No notification is required. <br />Observations/Alternatives: <br />Strategic Goals <br />As part of the 2013 City Council Strategic Goals, Staff has been analyzing expenscs related to the <br />administration of building permits, aswell asthemost cost effective way to delivertheseservices <br />while providing continuity and stability in an efficient manner. The2013 Strategic Plan notesa <br />recruitment of a Building Official, a position that is currently being served by contracted services. <br />After afull calendar year of analysis of contracting for Building Official services, it appears that <br />recruiting aBuilding Official asafull-time, regular City employeeremainsfairly budget neutral. In <br />addition, Staff is currently exploring ways to effectively and efficiently deliver thcsc services. Staff <br />is currently exploring such thi ngs as ePermits, el ectroni c/wi rel essfield data entry, and <br />streamlined/automated reporting; many of which have al ready been implemented. <br />The current rate for contracted services with I nspectron is $50 per hour. Current service levels have <br />required 40 hours per week of Building Official services and 20-30 hours per week of building <br />inspection and plan review services. Specific to the Building Official function (not base inspection <br />and plan review), it is assumed that the need is 2,000 hours of work hours required for the Building <br />Official. The potential annual budgetary impacts are estimated at $100,000. However, in 2012, the <br />budgetary impact was $91,000. Note: Due to the fact that the original contract was to provide <br />building inspection and plan review services, and did not include providing Building Official <br />services, it is anticipated that the contract may need to be revised to reflect the actual services <br />provided in the future. Staff would recommend that the City remain with contract services for <br />building inspection and plan review services on an as needed basis. Contracted services al low the <br />City to respond better to seasonal variations in service level needs. In addition, the contracted <br />services provide access to additional areas of expertise and review. <br />However, contracted services for the Building Official role presents the possibility of disruption in <br />the Continuity of delivery of services . There are two (2) options to consider for providing Building <br />Official services, depending on the level of guaranteed coverage the City Council is comfortable in <br />providing. Option 1 would be to hire a Building Official as a regular, full-time employee of the City. <br />This option would appear to be the preferred option if the City Council deci des 40 hours of coverage <br />per week is necary year round. However, Option 2 would be to continuewith contracted services <br />for the Building Official. This option would be acceptable if the City Council is comfortable i n <br />ass' imi ng that the Building Official hours could be reduced i n the non -peak times, thus creati ng <br />some gaps in coverage. <br />The City does not have f ul I control over assignments di rected by the contracted services. The <br />contracted service could decideto re -assign its staff over timeto other locations resulting in the loss <br />of expertise and know how specific to Ramsey. As each community has sl ightly different processes, <br />rates, and permit software, it is neccmary to provide the individual contractor with professional <br />development related to the City' s unique features and culture. Natural Iy, there are di rect and i ndi rect <br />costs involved in contractor development and staff is concerned with potential turnover. <br />Staff would recommend an external recruitment to hireafull-timeregular Building Official. Given <br />the current fees paid for contracted Building Official services and the City' s current Building <br />Official pay scale, the net sav i ngs to the City could be approxi mately $16,000 the fi rst year with <br />continued savings in years 2, 3, 4, 5. Year 6 (step 6---top of the Kale) would be the only year when <br />http://156.142.212.178:8080/pri nt_al I .cfm?seq=692& reloaded=true 5/22/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.