My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 05/28/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:15:24 AM
Creation date
6/19/2013 2:42:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7550 Sunwood Drive NW • Ramsey, Minnesota 55303 <br />City Hall: 763-427-1410 • Fax: 763-427-5543 <br />www.ci.ramsey.mn.us <br />25April 2013 <br />Dear Sign Professional: <br />The purpose of this correspondence is to request your quotation and proposal on the <br />construction of one or both sign and kiosk for The Draw, a 7-acre park in the City of Ramsey. <br />Your quote should be com prehensive in all ways, from locates, permits (fee waived), <br />mobilization, footings, tax, and all elements of construction to finish and site restoration. The <br />only aspect that each sign quote should not include, would bethepower supply (but include <br />all electrical components within the sign or monument). Bidders are strongly encouraged to <br />report with great specificity on any and all details of this design -build quote. For instance, <br />if one quoting firm spec'd X inch aluminum and another omitted specifying the aluminum's <br />thickness, the city may choose the sign firm with the greatest detail. The City of Ramsey does <br />reserve the right to re -bid the project, or choose any quoted proposal, based upon the best <br />interest of the City.. <br />Quotations are d ue by 2:00 p.m. on May 13th, 2013. In addition to the cost for each monument <br />or sign, you are also asked to identify how many full weeks from timeof order, to installation <br />will be needed. Please note liquidated damages of $50 per calendar day may apply after an <br />agreed to date. Note: It is the intention, if feasible, to have both signscompleted and in place <br />before the fi rst concert at The Draw on June 20th, 2013. <br />Available or attached to electronic correspondence are The COR design Guidelines (Appendix <br />B-Revised). Thisdocumentalsooutlinesthescopeoffutureprojectsand potential <br />opportunitiesfor your firm. For this reason, the city is anticipating very cost competitive <br />pricing for these first two, somewhat smaller stature signs or monuments <br />The first quote requested is for 'The Draw' sign depicted below. The sign portion shall be a <br />fabricated aluminum cabinet, with a double -sided or two, one (1) sided acrylic panel(s) with <br />UV resistant painted logo facing each way. The base shall be fabricated aluminum attached to <br />a poured concrete footing - thefooting shall be extended 18" inches at grade with a 'sidewalk' <br />surface to function asamowing maintenance strip. The base's finish shall be all faux Kasota <br />Stone (painted to match theMunicipal Center building in theCOR), and not with Dolomite <br />'bricks' shown. The side of the base will have a 'cap stone' and not the planter shown. <br />
The URL can be used to link to this page
Your browser does not support the video tag.