My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 05/28/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:15:24 AM
Creation date
6/19/2013 2:42:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This Kasota Stone monument shall be as shown, and note also the 'angle' on one side. On one <br />side the kiosk shall have blasted or carved 'EVENTS' as depicted, and another 'The DRAW' in <br />lieu of 'Directory'. The other two sides shall have the COR logo blasted or carved into the <br />Kasota Stone. The kiosk shall also have a concrete mai ntenance strip around the base. <br />Thetwo cabinet display areas shall be constructed of aluminum, lockable, and internally lit <br />with white LEDs. The clear panelsshall be vandal and scratch resistant. (The kiosk will not <br />have an electronic reader board as proposed in Appendix B.) <br />The 'cap stone' shall be fabricated aluminum painted a dolomite color as shown, together with <br />the two dolomite colored 'bands' below it. In between the bands will be three (3) internally lit <br />color bands as shown, in COR branded colors. As with The Draw sign, the cap stone shall be <br />adequately secured and vandal resistant. <br />General questions regarding this project may be addressed to meat 763 2381733, or <br />mriverblood(cri.ramsev.mn.us In the interest of maintaining thefairness and equability of <br />this design -build quotation process, unfortunately, I will not be available to 'talk -through' <br />specification choices or discuss alternative construction methods -you as the sign professional <br />areto decide these alternatives, and propose (in detail) the best value for the signs and way - <br />finding monumentsthat will beof high quality and durability in thesetwo areas of the public <br />park. <br />Sincerely, <br />CITY OF RA M SEY <br />Mark Riverblood, <br />Parks & Asst. Public Works Superintendent <br />THE <br />2 <br />Al M Ml*OTA <br />
The URL can be used to link to this page
Your browser does not support the video tag.