Laserfiche WebLink
updates, and two quotes to make those updates to this well. He advised that Connexus Energy has a rebate for <br />Variable Frequency Drive (VFD) installations and would pay $30/horsepower (HP). Well #4 is rated at 150 HP so <br />the rebate on this project, if approved, would be approximately $4,500. If approved, the upgrade would be funded <br />through the #9601 Water Enterprise Fund. Utilities Supervisor Nelson stated staff recommends awarding the quote <br />from Total Control Systems, Inc. to make all the needed upgrades to this site to include all parts, labor, start up, and <br />assistance with rebate application. <br />Motion to recommend that the City Council award the project to Total Control Systems, Inc. to make all the needed <br />upgrades to this site to include all parts, labor, start up, and assistance with rebate application. <br />5.03: Consider Policy for Allowing Fences to be Constructed in Drainage & Utility Easements with Infrastructure <br />Conflicts <br />City Engineer Westby reviewed the staff report, noting current City policy is to require landowners to install fences <br />away from the property line in areas where a potential infrastructure conflict exists. However, it is becoming <br />apparent that an issue is developing in regard to maintenance. City Engineer Westby displayed pictures of fences <br />and 2-4 foot wide remnant strips of land that remains between rear fence lines. He explained that this strip of land <br />provides for ease of inspection and minor maintenance of City -owned storm sewer systems, but creates a blight <br />situation as the property owners are likely unable to maintain the strip of property that is separated from the rest of <br />their yards by a fence. <br />Motion to recommend that the City Council take no action to create a policy as this problem is being caused by <br />ordinance violations <br />6.01: Update on Reconstruction Requests for Andrie Street <br />City Engineer Westby reviewed the staff report, noting that in 2008, the City completed a feasibility study and <br />prepared plans and specifications for the reconstruction of Andre Street; however, the project was never constructed <br />due to the controversy over whether or not sidewalks should be constructed. Public Works Superintendent Riemer <br />advised that recently, there has been renewed interest on the part of area residents to reconstruct Andrie Street but <br />likely not a new sidewalk. City Engineer Westby presented the two alternatives detailed in the staff report and <br />stated staff recommends updating the estimated costs for reconstructing Andrie Street and constructing new <br />sidewalk, and to prepare final costs and financing options for the street reconstruction effort. <br />Motion to recommend that the City Council approve Alternative 1, directing staff to update the 2008 Engineer's <br />estimate to reconstruct Andrie Street, to not include updating the sidewalk costs, and to determine costs for <br />widening the street to accommodate an on -street bike trail with parking restricted to one side based on MSA <br />standards. <br />6.02: Update on Turf Restoration at 7046 166th Avenue (Mack and Shayle Dominguez) <br />Public Works Superintendent Riemer reviewed the staff report and indicated that as directed by the Public Works <br />Committee at its October 15, 2012, meeting, staff has worked with Shayle Dominguez, 7046 166th Avenue, to <br />reach a suitable resolution to the restoration of their yard. He stated by July 1, 2013, this project will be concluded. <br />Informational; no action required. <br />6.03: Alpine Park Crosswalk <br />The Committee asked for an update on the crosswalk to Alpine Park. <br />Public Works Superintendent Riemer stated staff has not yet completed review of that item. <br />6.04: Future Agenda Items <br />Chairperson Backous explained that to conserve staff resources, it is policy that if two Councilmembers share <br />