My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 06/11/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:16:07 AM
Creation date
6/19/2013 4:04:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 4. 4. <br />Meeting Date: 06/11/2013 <br />By: Tim Gladhill, Community Development <br />Information <br />Title: <br />Receive Revised Architectural Renderings for Seasons of Ramsey <br />Background: <br />The Seasons of Ramsey Limited Partnership, the Developer for Seasons of Ramsey, has requested amendments to <br />the exterior materials to the approved site plan. The City Council approved the site plan in February, 2013. The <br />project is a 50-unit rental townhome development located at the north east intersection of Bunker Lake Boulevard <br />and Town Center Drive in the Town Center Gardens development (adjacent to The COR). The project is currently <br />under construction. <br />The revised architectural elevations are attached for review. Generally speaking, the amendments are as follows: <br />1. Change areas of steel shake material to steel vertical siding <br />2. Change color pallet <br />3. Brick threshold remains same, but use of alternative brick material. <br />As noted above, the Developer is proposing to change the construction method for the brick threshold. The <br />Developer is requesting the use of Nichiha Board, a fiber -cement panel. The Developer has supplied photo <br />examples of use of Nichiha Board for the brick material. It should be noted that the City has allowed various forms <br />of alternatives for brick construction. This would be the first time this material has been used specific to the <br />application of The COR Design Framework. <br />Overall, it appears that an appropriate mix of materials is still maintained; the majority material is not traditional <br />siding. There are no structural changes from the approved site plan, just the indicated exterior material list. Staff is <br />noting this change to the City Council to ensure proper tracking of approvals. <br />Notification: <br />No notification is required. <br />Observations/Alternatives: <br />Alternatives <br />Alternative #1 - Approve amended exterior material list as approved. Overall, this proposed change appears to be <br />acceptable. The Developer is proposing to utilize a mix of materials and colors and utilize quality materials. The <br />most notable change is the use of fiber -cement Nichiha Board panels for the brick material. <br />Alternative #2 - Approve the amended exterior material list with changes. The only consideration for change Staff <br />would suggest requesting a change would be the brick material. The City could allow the Developer to reduce the <br />amount of brick area and require the use of face brick. Face brick is a thin brick panel often set into a concrete <br />panel. For example, the municipal parking ramp utilizes face brick panels. <br />Alternative #3 - Deny the request. The Developer would be required to construct the buildings are originally <br />approved. It is noted that a majority of the requested changes are minor in scope. Staff would not recommend a full <br />denial of the request. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.