Laserfiche WebLink
• Picnics and number of tables <br />Bruce Bissonnette stated there would be 8 -10 tables under a covered area. Currently at Miller <br />Park, there are 3 -4 tables in a 20 -foot covered area. <br />Councilmember Backous asked about a sitting wall around the area. <br />Chair Olsen stated in her experience, people do not sit near the concession stand after they get <br />their food/beverages. <br />Commissioner Barr stated she would like to do it right and not have to add on later. <br />Chair Olsen asked what would more space add to the cost. <br />Bruce Bissonnette stated that has not yet been determined. <br />Kotchi Prosper stated we want to keep the people here with a nice facility rather than leaving <br />after their game. <br />• Shade and rain cover, size <br />Consensus - Size — is good <br />• Lockable rolling doors and sitting walls at pavilion <br />Consensus — Yes <br />Chair Olsen stated a temporary shelter is important when a storm is coming so people can wait <br />for the storm to pass. <br />• Second level for field observation <br />Jack Amdal stated a second level could be a control tower for tournaments, a benefit to this <br />building and location. <br />Bruce Bissonnette stated there are a couple of building code issues that will be looked at. <br />• Wall materials, roof materials, floor materials, exterior surfaces <br />Jack Amdal stated Miller Park has painted block. Metal roof is long lasting. <br />Parks & Assistant Public Works Superintendent Riverblood stated currently there are metal roof <br />on the shelters. He would like a cost estimate between metal roof and asphalt shingles. <br />Park and Recreation Commission /May 9, 2013 <br />Page 6 of 14 <br />