My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/18/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 06/18/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:34:32 AM
Creation date
6/19/2013 4:30:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Functional class = collector <br />• Traffic volumes = < 2,000 ADT (450 to 1,250 ADT in 2009) <br />• Design speed = 30 mph <br />• Parking = one side only (opposite on -road bike lane) <br />The 2013 estimated costs to reconstruct Andrie Street and 164th Lane using the design originally proposed in 2008, <br />excluding concrete sidewalks, is $1,620,000. For comparison purposes, the estimated cost in 2008 was $1,270,00. <br />These costs do not include indirect costs for engineering, administration, financing and legal costs, which typically <br />add about another 20% to the project costs. <br />The 2013 estimated costs to reconstruct Andrie Street and 164th Lane adding a 5 foot wide on -road bicycle lane is <br />$1,740,000. Again, these costs do not include indirect costs for engineering, administration, financing and legal <br />costs, which typically add about another 20% to the project costs. <br />The difference in estimated 2013 costs between the original design and the design utilizing an on -road bicycle lane <br />is roughly $120,000 based on preliminary estimates. <br />Alternatives - <br />Alternative #1 - Provide a recommendation to Council directing staff to update the 2008 Feasibility Report based <br />on the original 2008 street reconstruction design (excludes sidewalks). This option should be chosen if the Public <br />Works Committee feels the project should not include sidewalks or other pedestrian facilities. <br />Alternative #2 - Provide a recommendation to Council directing staff to revise the 2008 Feasibility Report to reflect <br />the inclusion of on -road bicycle lanes, in place of sidewalks. This option should be chosen if the Public Works <br />Committee feels the project should not include sidewalks but should include an on -road bicycle lane as an alternate <br />pedestrian facility. <br />Alternative #3 — Motion of other, or do nothing. <br />Funding Source: <br />At this time there are not sufficient funds in the MSA account to fund any of the improvements. As such, funding <br />would need to be provided using special assessments, bonds, adoption of a franchise fee, or a combination thereof. <br />In other words, the City should consider the long-term comprehensive street reconstruction funding program prior <br />to ordering this project. However, if alternative #1 or #2 is chosen, no funds would need to be committed at this <br />time and staff would have additional time to complete the long-term street reconstruction funding program as <br />required to address the funding shortage for these improvements while completing revisions to the Feasibility Study. <br />Staff Recommendation: <br />Staff recommends approving alternative #1 or #2. <br />Action: <br />Approve alternative #1, #2 or #3. <br />Andrie St Feas Study w surveys <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 06/13/2013 01:17 PM <br />Kurt Ulrich Kurt Ulrich 06/13/2013 02:51 PM <br />Form Started By: Bruce Westby Started On: 06/03/2013 09:09 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.