Laserfiche WebLink
Consensus - Will be addressed at a later date. <br />• Heating A/C systems <br />• Geo- thermal <br />• Gray water collection <br />• Energy management controls <br />• PA system <br />Consensus - not necessary. Use air horn if necessary for storms. PA systems can be borrowed <br />from City. <br />• IT needs <br />Parks & Assistant Public Works Superintendent Riverblood stated staff will bring costs for cell <br />service /Wi -Fi to the City Council. <br />Site considerations <br />• Trash and recyclables <br />Part of tournament <br />• Cistern for roof rain water collection/irrigation <br />• Permeable pavers <br />Will be discussed later <br />• Tree trenches /irrigation <br />• Playground <br />• Skating /winter activity uses <br />• Benches <br />• Re -bound wall <br />Kotchi Prosper supported adjacent to the building, noting it could be more removed from the <br />building. <br />Jack Amdal and Bruce Bissonnette showed a project drawing to the Commission. The drawing <br />presented is a third bigger than Miller Park with a 20 -foot x 30 -foot covered shelter area 8 -10 <br />tables They do not want to short- change the size of the concession stand and suggested a half <br />door between concession stand and inside gathering area and double doors on the storage room <br />from the outside. They showed a plan of the building location in the park, noting the picnic area <br />is sheltered from the wind by the building. <br />Commissioner Barr stated you should be able to see the playground without being obstructed by <br />the building. <br />Park and Recreation Commission/May 9, 2013 <br />Page 13 of 14 <br />