Laserfiche WebLink
Enterprise Park to Crooked Lake 115 kV Transmission Line March 2012 <br />Environmental Assessment <br />List of Tables <br />Table 3.1: Project Location <br />Table 5.1 Number of Residences within 300 Feet of the Proposed Route Alignment <br />Table 5.2: Noise Area Classifications & Standards <br />Table 5.3: Conductor Noise Estimates — Heavy Rain Case <br />Table 5.4: State -Specific Standards for Electric Fields <br />Table 5.5: International Guidelines and Standards for EMF <br />Table 5.6: Calculated Electric Fields (kV/m) for the Project (1 meter above ground) <br />Table 5.7: Calculated Magnetic Flux Density (milligauss) for the Project (lm above <br />ground) <br />Table 5.8: Locations of NWI Wetlands in Project Area <br />Table 5.9: Population Characteristics <br />Table 5.10: Race/Ethnicity Characteristics <br />Table 5.11: Household Economic Characteristics, 2010 <br />Table 6.1: Potentially Required Permits and Approvals <br />List of Figures <br />Figures in Text <br />Figure 1: Project Overview <br />Figure 2: Transmission Line Route Map <br />Figure 3: Schematic Diagrams of Typical Transmission Line Structures <br />Figure 4: Land Use Map <br />Figure 5: Project Area Resources Map <br />Figures in Appendix A <br />Figure 6: Transmission Line Route Map Sheet Key <br />Figure 6a — 6j: Detailed Sheet Maps <br />v <br />