Laserfiche WebLink
Enterprise Park to Crooked Lake 115 kV Transmission Line March 2012 <br />Environmental Assessment <br />Table 5.6: Calculated Electric Fields (kV/m) for the Project (1 meter above ground) <br />Distance to Proposed Centerline <br />Scenario -300' -200' -100' -50' -25' Max. 25' 50' 100' 200' 300' <br />Horizontal Post <br />Operation No <br />Distribution 0.01 0.02 0.06 0.22 0.49 1.39 0.67 0.20 0.07 0.02 0.01 <br />Underbuild <br />Average Load <br />Horizontal Post <br />Operation No <br />Distribution 0.01 0.02 0.06 0.22 0.49 1.39 0.67 0.20 0.07 0.02 0.01 <br />Underbuild <br />Peak Load <br />Horizontal Post <br />Operation with <br />Single Circuit 0.01 0.02 0.07 0.21 0.30 0.38 0.42 0.18 0.07 0.02 0.01 <br />Distribution <br />Underbuild <br />Average Load <br />Horizontal Post <br />Operation with <br />Single Circuit 0.01 0.02 0.07 0.21 0.30 0.38 0.42 0.18 0.07 0.02 0.01 <br />Distribution <br />Underbuild <br />Peak Load <br />Horizontal Post <br />Operation with <br />Double Circuit <br />Distribution <br />Underbuild <br />Average Load <br />Horizontal Post <br />Operation with <br />Double Circuit 0.01 0.02 0.07 0.18 0.20 0.31 0.30 0.15 0.07 0.02 0.01 <br />Distribution <br />Underbuild <br />Peak Load <br />0.01 0.02 0.07 0.18 0.20 0.31 0.30 0.15 0.07 0.02 0.01 <br />37 <br />