Laserfiche WebLink
Enterprise Park to Crooked Lake 115 kV Transmission Line March 2012 <br />Environmental Assessment <br />6. Required Permits and Approvals <br />Construction of the Project would require a High Voltage Transmission Line (HVTL) <br />permit from the Commission (Minn. Stat. 216E.03, subd. 2). Additional potentially <br />required permits and approvals are listed in Table 6.1 below. <br />Table 6.1: Potentially Required Permits and Approvals <br />Permit Jurisdiction <br />Section 404 Permit, Clean Water Corps of Engineers Section 10 <br />Act (Local/State/Federal Application Permit <br />for Water/Wetland Projects, for <br />discharge of fill due to placement of <br />poles in wetlands) Section 106 <br />Review <br />Part 7460 review (to ensure compliance with FAA <br />7460) <br />Spill Prevention, Control and EPA <br />Countermeasure (SPCC) Plan <br />(Xcel Energy for modifications to the Crooked <br />Lake Substation and Anoka Municipal Utility <br />for modification at the Enterprise Park <br />Substation) <br />Minnesota State Approvals <br />License to Cross Public Waters or State DNR — Lands and Minerals <br />Lands <br />Utility Permit (Road Crossing Permits to Mn/DOT <br />cross or occupy state trunk highway roadright- <br />of-way) <br />NPDES Construction Stormwater Permit MPCA <br />(Xcel Energy for modification at Crooked <br />Lake Substation and Anoka Municipal Utility <br />for modifications at Enterprise Park <br />Substation) <br />NPDES Construction Stormwater Permit <br />(Great River Energy, for line construction) <br />Minnesota Local Approvals <br />Land Permits, including road crossing/right- <br />of-way permits (may be required to occupy <br />lands such as parklands, watershed districts, <br />and other publicly -owned land) <br />Minnesota Wetland Conservation Act <br />60 <br />County, City <br />County, Board of Water and Soil <br />