Laserfiche WebLink
Scoping Decision Document <br />PUC Docket No. ET2/TL-11-915 <br />General Description of the Proposal <br />A. Project Description <br />B. Purpose of the Transmission Line <br />C. Project Location <br />D. Route Description <br />E. Route Width <br />F. Right -of -Way <br />1. General use of right-of-way <br />2. Existing easements <br />3. Restoration and maintenance <br />G. Project Cost <br />II. Regulatory Framework <br />A. Certificate of Need <br />B. High Voltage Transmission Line Route Permits <br />C. Environmental Review Process <br />III. Engineering, Design, and Operation <br />A. Transmission Line Conductors <br />B. Transmission Line Structures <br />1. Design and structure material <br />2. Structure strength and stability (i.e. Structural failure) <br />C. Substations <br />D. Undergrounding Transmission Line Facility <br />IV. Construction <br />A. Transmission Line and Structures <br />B. Substations <br />C. Restoration and Cleanup <br />D. Property Destruction and Compensation <br />E. Operation and Maintenance <br />V. Affected Environment, Potential Impacts, and Mitigation Measures <br />A. Environmental Setting <br />B. Socioeconomic and Cultural Setting <br />C. Human Settlement <br />1. Noise <br />2. Aesthetics <br />3. Proximity to homes <br />4. Existing utilities <br />Page 4 of 9 <br />