1 ROUTE PERNIIT <br />The Minnesota Public Utilities Commission (Commission) hereby issues this route permit to <br />Xcel Energy (permittee) pursuant to Minnesota Statute 216E.03 and Minnesota Rules 7850. <br />This permit authorizes the permittee to construct approximately 4.7 miles of new 115 kV <br />transmission line and associated facilities in Benton County, Minnesota and as identified in the <br />attached route permit maps, hereby incorporated into this document. <br />2 PROJECT DESCRIPTION <br />The permittee is authorized to construct a project comprising a 4.7-mile transmission line and as <br />described in the route permit application and evaluated in the environmental assessment. The <br />approved route is shown on the route permit maps attached to this permit and further designated <br />as described. <br />The project consists of a new 4.7-mile long 115 kV transmission line and is divided into two <br />segments. The first segment (new Line 5520) is approximately 4 miles long and will be <br />constructed between the Mayhew Lake Substation and the Granite City Substation. The second <br />segment (extension of existing Line 5509) is approximately 0.7 miles long and will be <br />constructed between the intersection of Line 5509 with Lines 0887 and 0899 and Structure 39. <br />The permitee may construct, modify, and upgrade the following for the project: <br />• construct approximately 4 miles of new 115 kV transmission line (Line 5520) between <br />the Mayhew Lake Substation and the Granite City Substation; <br />• remove a 1,700 foot segment of existing single -circuit 115 kV transmission line (Line <br />5509) between the Granite City Substation and its intersection with Lines 0887 and 0899; <br />• install approximately 0.7 miles of new 115 kV transmission line to extend existing Line <br />5509 from its intersection with Lines 0887 and 0899 to Structure 39, install either a new <br />single -circuit pole or a new double -circuit structure near Structure 39 and connect Line <br />5509 from Structure 39 to existing Line 0899, thus creating newly designated Line 5509 <br />connecting the Mayhew Lake Substation to the Benton County Substation; <br />• remove existing Line 0887 jumper at Structure 39 so that Line 0887 is no longer <br />connected to Benton County Substation, and keeping Line 0887 connection between the <br />St. Cloud and Granite City substations; <br />• disconnect the existing Line 0899 at Structure 39 to the Benton County Substation and <br />connecting to removed Line 0887 segment from Structure 39 to Benton County <br />Substation, and designating this revised line from Granite City to Benton County <br />substations as Line 0899; <br />• install fiber optic ground wire with the new 115 kV line and the remaining segment of <br />Line 0899; and <br />November 2010 Page 1 4 <br />