Benton County, St. Cloud, and Crossroads Substations <br />Changes and modifications will include replacements or upgrades of relays and communication <br />equipment internal to the control house(s), installing fiber optic lines for relaying and transfer <br />trip, installing breakers, reconfiguring line protection, replacing shield wire with fiber optic <br />shield wire, and related modifications. <br />Transmission Structure 39 <br />Jumpers connecting existing lines will be removed and new jumpers will be added to Structure <br />39 depending on the proposed transmission line re -designations. New single- and/or double - <br />circuit structures will also be constructed near Structure 39 to support the new transmission line <br />connections and re -designations. <br />2.3 Structures and Conductors <br />The primary structure or tangent structure the permittee shall use for the project is a galvanized <br />steel, weathering steel or wood single -pole structure with braced posts or davit arms. The <br />tangent structures will be approximately 70 feet to 90 feet in height with an average span of 300 <br />feet to 400 feet between structures (500 foot maximum). The steel structures will have up to a 5 <br />foot to 8 foot average diameter foundation at ground surface and taper with height. <br />Approximately 2.7 miles of the new transmission line shall follow and be underbuilt with <br />existing distribution lines along U.S. Highway 10. The permittee shall design the project to fit <br />within these existing easements, thereby requiring less right-of-way while still satisfying the <br />needs of the project. For this segment of the project the permittee shall use the same tangent <br />structures as described above with the addition of a distribution crossarm. <br />Angle structures will be similar in design to the tangent structures described above. Given the <br />limited right-of-way, guyed structures would likely not be necessary. <br />Double -circuit structures may be used for approximately 0.7 miles of the route where existing <br />Line 5509 would be extended from its intersection with Lines 0887 and 0899 to Structure 39. A <br />double -circuit structure may also be required to connect the newly extended Line 5509 from <br />Structure 39 to existing Line 0899 that runs to the existing Benton County Substation. The <br />double -circuit structures will be a galvanized or weathered steel single -pole with davit arms <br />approximately 75 to 105 feet in height with spans of 300 to 500 feet. <br />The phases for the project will be constructed with three single steel supported aluminum <br />conductors (ACSS) which each consist of a single conductor comprised of seven steel core <br />strands surrounded by 26 outer aluminum strands. The separate conductors are 795,000 circular <br />mils or approximately 1.092 to 1.139 inches in diameter. The 115 kV transmission line would be <br />three-phase, 60 Hz (hertz), alternating current line. <br />November 2010 Page 6 <br />