Laserfiche WebLink
3 DESIGNATED ROUTE <br />The approved route is shown on the route maps attached to this permit and further designated as <br />follows: <br />The transmission line exits the existing Mayhew Lake Substation, heads west along County Road <br />29 for one-half mile and south-southwest for three -tenths of a mile cross-country to U.S. <br />Highway 10. The route proceeds south along the east side of U.S. Highway 10 for two and nine - <br />tenths miles, turns east for three tenths of a mile following County Ditch 3 to the existing Granite <br />City Substation. A second segment of new transmission line will connect to existing Line 5509 <br />at 14th Avenue NE and head south-southeast following County Ditch 3 and existing transmission <br />lines in the area for approximately seven -tenths of a mile to existing Transmission Structure 39. <br />3.1 Route Width and A1ienment <br />As depicted in the route maps attached to this permit, the designated route will be limited to 400 <br />feet in width for the entire length of the transmission line route, as follows: 200 feet on each side <br />of the proposed alignment from the Mayhew Lake Substation west to its intersection with U.S. <br />Highway 10; a 400 foot route width left -aligned with the eastern edge of the northbound lanes of <br />U.S. Highway 10; 200 feet on either side of the proposed alignment from U.S. Highway 10 <br />heading east along County Ditch 3 to the Granite City Substation; 200 feet on either side of the <br />proposed alignment for the new segment extending Line 5509 at approximately 14th Avenue NE <br />to Structure 39. A 200 foot route width extending from the existing Xcel Energy -owned <br />Mayhew Lake and Granite City substations and 1.4 acres of additional route width located north <br />of the Granite City substation also are authorized. These widths will provide the permittee with <br />flexibility for minor adjustments of the specific alignment or right-of-way to accommodate <br />landowner requests and unforeseen conditions. The final alignment (i.e., permanent and <br />maintained rights -of -way) will be located within this designated route unless otherwise <br />authorized below. <br />Consequently, this permit anticipates that the actual right-of-way will generally conform to this <br />alignment unless changes are requested by individual landowners, unforeseen conditions are <br />encountered, or are otherwise provided for by this permit. Any alignment modifications within <br />this designated route shall be located so as to have comparable overall impacts relative to the <br />factors in Minnesota Rule 7850.4100 as does the alignment identified in this permit, and shall be <br />specifically identified and documented in and approved as part of the Plan and Profile submitted <br />pursuant to Section 4.1 of this permit. <br />November 2010 Page 1 8 <br />