Laserfiche WebLink
Continuing brush chipping prop-am ~er the f~t two years will be ~complislx~d by the use of funds generated from <br />thc Rarnsey Landfill surcharge and thc use of user fcc~. The cost of the program will be grcady reduced beczuse thc <br />amount of backlogged organic material will be nonexistent. The cost will also bc reduced by thc use of the <br />promotional and educational material dcvclope, d in thc first two ye, ars of the program. The over .ql cost would bc for <br />the actual use of the brush chipper and ~flflitional printing of thc educational and promotional materials.The funding <br />from these areas would also cover the costs associated with the updating of the e.,du=tional materials. <br /> <br />C. 6. ~xp~Wn how thc Demonsu"ndon Proj~: will enable signi~c.~nt work to occur that would not <br /> otherwise be possible. <br />The City of Ramsey does not have thc educational resources (materials) nor funding available al this time for the <br />Brush Chipping Demonstration Program which can full)' impact the entire City. The volume of back logged. <br />dismsed and dying trees mad other woody vegetation is extreme. Without Metropolitan Council funding assisumce. <br />the volume of woody "waste~ will iner~se greatly due to uncontrolled spr~d of disease and the missed opportunity <br />to implant sound environmental (abat, ment) public e. zlu~tion information to lower future "w'aste~ generation rmes. <br /> <br /> <br />