My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/28/1989
Ramsey
>
Public
>
Agendas
>
Council
>
1989
>
Agenda - Council - 02/28/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:14:54 PM
Creation date
11/21/2003 10:44:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/28/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 PURPOSE OF THE PROPOSED ACTION <br /> <br />The existing airport currently serves the needs of the Anoka- <br />Ramsey-Elk River area. it has been identified as a minor <br />airport in the regional system in the 1978 Metropolitan <br />Council's Aviation Guide and in the 1987 update. As a privately <br />owned airport, however, the likelihood of the facility's conti- <br />nued ability to meet demands are uncertain. This is due <br />primarily to development pressure, the resultant increasing tax <br />burden on the owhers of the current facility, lack cf facilities <br />to meet demand expectations and lack of capital to improve the <br />facility. These same pressures have forced and continue to <br />force privately owned public use airports around the country to <br />close. <br /> <br />The proposed improvements would provide a municipally owned <br />facility which meets state and federal standards for a Basic <br />Utility II airport. The 3300' runway length would be capable of <br />serving most single engine and light twin engine aircraft <br />weighing less than 12,500 pounds. As proposed, the airport <br />would complement the regional system (Figure 1-3) and if <br />converted to municipal ownership, would provide the long-te~ <br />capability to meet local service area demands. <br /> <br />Aviation Activity Forecasts <br /> <br />Table i-1 presents a synopsis of the activity forecasts <br />generated in the Master Plan Study. The forecasts indicate that <br />the airport will experience steady growth both in numbers of <br />based aircraft and annual operations with the proposed <br />improvements. The forecasts also indicate an increasing <br />proportion of itinerant flights with the facility improvements. <br /> <br />TABLE i-i <br /> <br />HIGHLIGHTS OF AVIATION ACTIVITY FORECASTS <br /> <br />GATEWAY NORTH iNDUSTRiAL AIRPORT <br /> <br />Baseline <br /> <br />Number of Based Aircraft <br />Itinerant Operations <br />Local Operations <br />Total Operations <br />itinerant Passengers <br /> <br />12 25 35 52 <br />1,280 5,325 9,940 20,310 <br />7,240 12,425 14,910 !6,6!0 <br />8,520 17,700 24,800 36,900 <br />3,250 13,250 24,750 41,500 <br /> <br />1-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.