Laserfiche WebLink
Financial Assurance Worksheet <br /> <br /> This worksheet will enable the applicant to calculate the minimum amount of <br />financial assurance required for the applicant's facility site. Include this worksheet <br />with the financial assurance mechanism. <br /> <br />Step 1, <br /> <br /> Calculate the mileage from the applicant's facility site to the four processing <br />facilities and fill in the mileage spaces. All mileage must be calculated via trunk <br />highways. <br /> <br />Distance to: <br /> <br />D = mileage = <br /> <br />T = tipping fee = <br />TC = trans, costs = <br /> <br />primary haul <br />secondary haul <br />L = load size = <br /> <br />H = handling costs = <br /> <br />B a bbitt Mo ra Preston <br />$500/Ioad $500/Ioad $500/Ioad <br /> <br />$2.50/mile $2.50/mile $2.50/mile <br />$1.25/mile $1.25/mile $1.25/mile <br />1000 tires 1000 tires 1000 tires <br />$100/Ioad $100/load $100/Ioad <br /> <br />Step 2 <br /> <br /> Calculate the cost per tire for cleanup of the site by replacing the' variables in the <br />following formulas for each processing facility. Formula 1 uses a primary haul <br />situation and formula 2 uses a secondary haul situation. <br /> <br /> Basic Formula <br />[D (miles to processor) x T (trans. costs)IL (load ~'izTe/tippinq fee) + H (handlinq costs) <br /> <br /> = cost per tire for cleanup <br /> <br /> <br />