Laserfiche WebLink
II. <br /> <br />CUMULATIVE POTENTIAL EFFECTS OF RELATED OR ANTICIPATED FUTURE <br />PROJECTS <br /> <br />The purpose of this project is to allow for controlled growth <br />in the southeastern corner of the City of Ra~.sey. With the <br />construction of a municipal sewer and water system for this <br />project, additional development can occur in the area. Future <br />development would be consistent with the City's Comprehensive <br />Plan and regional plans for the area. (Ramsey Comprehensive <br />Plan) <br /> <br />III. THE EXTENT TO WHICH THE ENVIRONMENTAL EFFECTS ARE SUBJECT TO <br /> MITIGATION BY ON-GOING PUBLIC REGULATORY AUTHORITY <br /> <br />This project is subject to an MPCA sewer extension permit. <br />DNR permits to appropriate waters and alter wetlands, and the <br />review and approval of the public water main extensions by the <br />Minnesota Department of Health. <br /> <br />The major issue with this project is access to the plat. As <br />part of the plat approval, the City will require a new street <br />to be constructed to the south of Hunter's Hill which would <br />provide access to Sunfish Lake Blvd. (EAW and Comments to the <br />EAW) <br /> <br />IV. <br /> <br />THE EXTENT TO WHICH ENVIRON~[ENTAL EFFECTS CAN BE ANTICIPATED <br />AND CONTROLLED AS A RESULT OF OTHER ENVIRONMENTAL STUDIES <br />UNDERTAKEN BY PUBLIC AGENCIES OR THE PROJECT PROPOSER, OR OF <br />EIS'S PREVIOUSLY PREPARED ON SIMILAR PROJECTS. <br /> <br />The Metropolitan Council and MWCC have conducted several <br />studies concerning the wastewater treatment needs for this <br />portion of the metropolitan area. <br /> <br />The most recent study completed is as follows: <br /> <br />"Northwest Area Study, Final Report", Metropolitan <br />Waste Control CoK~ission, prepared by Consulting <br />Engineers Diversified and CH2F~{i!i, June, 1980 <br /> <br />In addition to the above, the City of Ramsey has completed the <br />following studies or plans, which address municipal utilities <br />required for the proposed project. <br /> <br />"Report on Comprehensive Sanita.~-y Sewer Plan for the City of <br />Ramsey", prepared by C.E.D., Inc., Septemfmer, 1975 <br /> <br />"Comprehensive Sto_--m Drainage Plan for the City cf Ramsey", <br />prepared by C.E.D., !nc., February, 1950 <br /> <br />"Comprehensive Water Plan for the City cf Ra~.sey, prepared by <br />C.E.D., ~nc., Septer~er, !951. <br /> <br /> <br />