My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 07/09/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:16:51 AM
Creation date
7/10/2013 8:45:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council's consideration with the City of Saint Francis to provide assistance with plan review and inspections. This <br />is in addition to the services provided by Inspectron, Inc. Due to an urgent need, staff from Saint Francis has <br />provided some assistance on the week of July 1, 2013 in order to address the high volume of inspection requests <br />during a short week. This was only approved as a temporary solution until the City Council could consider <br />approving the attached agreement. <br />This interim solution appears to be a good compromise that allows both the City and Inspectron to make sound <br />staffing decision based on forecasted service level needs. Staff recommends that it is important to continue the <br />current relationship with Inspectron, Inc. Saint Francis currently has a full-time Building Official and part-time <br />Building Inspector. Staff has been able to secure an arrangement to capitalize on the additional time available from <br />the part-time Building Inspector. The City of Saint Francis has a similar agreement on a longer term basis with the <br />City of Nowthen. Staff would like to disclose that the Saint Francis Building Official, Andrew Schreder, is a former <br />Ramsey Building Inspector. This position was eliminated due to budget reductions based on service levels. <br />Staff would recommend ratification of the service agreement with the City of Saint Francis on an interim basis and <br />allow Staff to continue discussions to see if this could be a longer term solution. The City of Ramsey has a history <br />of successful relationships and collaborations with the cities of Saint Francis and Nowthen. However, Staff would <br />desire to complete the current recruitment for a Building Official before approving any long term staffing decisions. <br />Again, at this time, it would be recommended that this would be balanced with the existing partership with <br />Inspectron, Inc. <br />Notification: <br />No notification is required. <br />Observations/Alternatives: <br />Current permit revenue updates through mid -day July 3, 2013 are as follows (a detailed report is attached to this <br />case): <br />Revenue Type Forecasted Actual % of Forecasted % of Year Complete <br />Base Building Permit $260,000 $198,461 25 76% 50% <br />Plan Review $125,000 $108,195 05 86% 50% <br />Plumbing $20,000 $25,268 00 126% 50% <br />Heatmg/Mech $20,000 $30,391 07 151% 50% <br />Electrical $30,000 $34,877 75 116% 50% <br />Septic $20,000 $6,570.00 32% 50% <br />Urban Sewer $7,000 $7,125 00 101% 50% <br />Urban Water $7,000 $7,479 80 106% 50% <br />Alternative # 1. Approve interim solution and Agreement for Services with City of Saint Francis. This alternative <br />allows the City to complete the recruitment for the Building Official, and utilize that individual to assist in the <br />formulation of a longer term staffing proposal, which could include continued parterships with Inspectron, Inc. and <br />City of Saint Francis or the addition of an additional staff member (either part time or full time) depending on <br />service level demands and City Council desires. <br />Alternative #2. Continue with current arrangement with Inspectron, Inc. that provides forty (40) hours of service <br />and not approve an agreement with City of Saint Francis as an interim solution for service level gap (an additional <br />twelve [12] hours of service). Again, the service level gap is not due to the quality of service provided by <br />Inspectron, Inc., rather a need to properly addressing staff levels during the recruitment of Ramsey's Building <br />Official before adding any additional staff. This alternative is not recommended by Staff. Staff recommends that the <br />current service levels without the assistance are unacceptable to our customers. This interim solution appears to <br />balance recruitment needs and desires of both Inspectron, Inc. and the City. <br />Alternative #3. Hire an additional Building Inspector to replace a portion of service levels provided by Inspectron, <br />Inc. and continue parternship with Inspectron, Inc. for service needs above this level. This could be a longer term <br />solution; however, Staff desires input of the future Ramsey Building Official before making this longer term <br />decisino. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.