My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 07/16/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:34:48 AM
Creation date
7/17/2013 1:37:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer Westby stated the existing wall would then have to be moved about five feet <br />towards the house and would not have to be as tall as if located at the property line. <br />Chairperson Backous stated selling five feet of the easement may not impact the City, especially <br />if the abutting property has a large stormwater pond. <br />City Engineer Westby agreed it should not cause an issue. <br />Councilmember Riley asked if the intent is to build a better retaining wall. <br />City Engineer Westby stated staff did explain how to construct a structural retaining wall. <br />Chairperson Backous suggested staff determine the cost for selling a five-foot easement strip so <br />the property owner can determine if it is economically feasible. He noted that is an option that <br />has not yet been explored and offers an option other than denying the request. <br />Councilmember Riley asked if staff had explained the need to establish sod to eliminate erosion. <br />City Engineer Westby answered in the affirmative. He stated staff will determine a cost and <br />schedule this case for consideration at a future Public Works Committee meeting. <br />5.04: Review Condition of Dysprosium Street Boulevard and Future Maintenance <br />Requirements <br />Public Works Superintendent Riemer reviewed the staff report and described the turf restoration <br />that took place following the Dysprosium Street reconstruction. It was noted that while the sod <br />was healthy in the spring of 2012, it started to decline over the summer months due to lack of <br />rain and hot weather. The current price is $1.35 per square yard plus delivery costs <br />(approximately $4,000); however, staff recommends replacement of sod between the curb and <br />sidewalk only if an agreement can be reached with residents that they will maintain the sod once <br />it is established. <br />Jeff Geldert, 14044 Dysprosium Street, stated he was unemployed when the sod was installed <br />and does not think they used quality topsoil. He stated he had to unroll the sod and lay down two <br />inches of black dirt over the sand and glass along with grass seed because the sod strips were not <br />tightly laid. Mr. Geldert felt the problem was that good black top soil was not used. <br />Chairperson Backous stated the City had another project with this same problem because the <br />black dirt was of poor quality containing rocks and glass. Because of that, the City changed its <br />policy to address the quality of black dirt that is used on projects. <br />Darin Rorman, 14020 Dysprosium Street, stated the contractor did no prep work and laid the sod <br />down over the sand, his flowerbed, and existing grass. Because of this, the sod had to be watered <br />constantly. In addition, snow and salt is pushed onto the boulevard, making the sidewalk un- <br />passable. <br />Public Works Committee / June 18, 2013 <br />Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.