Laserfiche WebLink
any lot that abuts a pond unless the pond infrastructure is completed according to the City approved <br />plan. <br />No Certificate of Occupancy permit shall be issued for any house in the plat until the <br />following have been completed: <br />A. An as -built plan of the development and a letter from the Developer's engineer <br />certifying the plat has been graded according to the grading, drainage and erosion <br />control plan as approved by the City. The Developer will notify the City a minimum <br />of two (2) weeks prior to any Certificate of Occupancy permit being requested. <br />B. The first lift of street asphalt surface, sanitary sewer, storm sewer and water has been <br />constructed, considered operational, and approved by the City Engineer. The <br />Developer will notify the City a minimum of two (2) weeks prior to any Certificate <br />of Occupancy permit being requested to allow adequate time for an inspection to be <br />completed of all the required improvements. <br />The Developer further agrees that it will not cause to be occupied, any premises constructed <br />upon the plat or any property within the plat until the completion of the gas, electric, telephone, <br />cable television (if available), streets to asphalt surface, sanitary sewer, storm sewer, and water, <br />unless the City has agreed in writing to waive this requirement as to a specific premises. <br />Seeding and sodding of the lot shall be completed prior to a certificate of occupancy. In <br />the event a lot is not seeded or sodded and does not have 4 inches of black dirt spread prior to <br />issuance of a Certificate of Occupancy, the builder of a house constructed upon a lot shall post a <br />$2,000 cash escrow for each lot that is not seeded or sodded, to assure that the lot will have black <br />dirt and a lawn established within six months. Escrowing prior to issuance of the Certificate of <br />Occupancy shall also be required for all other incomplete items. <br />The City Building Official may issue a stop work order for any violations relating to silt <br />fencing, erosion control or tree protection. <br />ARTICLE XII <br />Cleanup <br />Developer shall promptly clean dirt and debris from streets that has resulted from <br />construction by the Developer, its agents or assigns. Performance shall be guaranteed by the <br />Performance Guarantee recited herein. City reserves the right to perform such work as necessary <br />and will invoice all costs to Developer if not completed within the timeframe set by the City, its <br />agents or assigns, in a written notice. The Developer shall be responsible for rubbish and/or <br />construction debris blown off the Property. <br />ARTICLE XIII <br />Ownership Of Improvements <br />15 <br />