My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/1989 - Closed Executive Session and Regular Meeting
Ramsey
>
Public
>
Agendas
>
Council
>
1989
>
Agenda - Council - 08/08/1989 - Closed Executive Session and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:09:46 PM
Creation date
11/25/2003 3:19:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Closed Executive Session and Regular Meeting
Document Date
08/08/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. A grass cover shall be established by the owner or the <br />owner's agent over the soil treatment area. <br /> <br />Dual Field Systems <br /> <br /> 1. Dual field systems shall be used only whare the <br />percolation rate is slower than five minutes per inch. <br /> <br /> 2. Dual field systems shall be sized, designed, and <br />constructed as set forth above for standard systems except as <br />follows: <br /> <br />The soil treatment area shall be divided into two or more <br />parts. <br /> <br />Alternating soil treatment areas shall each be connected <br />to a valve box outlet. <br /> <br /> 3. A part of the soil treatment area shall be used no more <br />than one year unless inspection of the effluent level indicates <br />that a longer duration can be used. <br /> <br />Slowly Permeable Soils <br /> <br /> 1. Excavation for the purpose of constructing a soil <br />treatment system must not be made in any soil layer having a <br />percolation rate slower than 120 minutes per inch. <br /> <br /> 2. Excavation for the purpose of constructing a soil <br />treatment system must not be made in a soil layer having a <br />percolation rate slower than 60 minutes per inch unless the <br />moisture content is lower than the plastic limit of the soil. <br /> <br /> 3. Drainfield rock must not be placed in contact with <br />original soil having a percolation rate slower than 60 minutes per <br />inch. <br /> <br /> 4. Where the percolation rate of the original soil is slower <br />than 60 minutes per inch, at least 12 inches of fill material <br />having a texture defined as sand must be placed between the <br />drainfield rock and the original soil along the excavation bottom. <br /> <br /> 5. Construction equipment wheels or tracks must not be placed <br />in contact with the bottom of the excavation during the <br />construction of a soil treatment system in soils having a <br />percolation rate slower than 15 minutes per inch. <br /> <br /> 6. The size of the soil treatment system must be based on an <br />acceptance rate of 0.24 gallons per square foot, which is <br />equivalent to a sizing factor of 4.2 square feet per gallons per <br />day. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.