Laserfiche WebLink
a. shoreiand zomn9 d~strict? <br />b. dehneated lO0.year flood plain? <br />c. slate or Jederally designated river land use district? <br />I! yes. identity water body and applicable state classification(s), and describe measures <br />to prolect water and related land resources: <br /> <br />19. <br /> <br />Describe any physical aheralion (e.g., dikes, excavation, fill. stream diversion) of any <br />drainage system, lake, stream, and/or wetland. Describe measures to minimize im- <br />pairment of the waler-related resources. Estimate quantity of malerial to be dredged <br />and indicate where spoils will be deposited. <br /> <br />See Attachment (PP. viii-xiii and p.xxii) <br /> <br />20. <br /> <br />a.Will the project require an appropriation of ground or surface water? l[ yes, explain <br /> (indicate quantity and source): <br /> <br /> Temporary dewatering for roadbed construction <br /> and peat excavation may be required.. <br />b.Will the project affect groundwater levels in any wells (on or off the site)? iir yes, ex- <br /> plain: <br /> <br />[] No [] Yes <br /> <br />[~ No [] Yes <br /> <br />1 o Describe the erosion and sedimentation control measures to be used during and after <br /> construction of the project. <br /> <br />See Attachment (p.xii) <br /> <br />22. <br /> <br />Will the project generate: <br />1. surface and stormwater runoff?. <br />2. sanitary was(ewater? <br />3. industrial wastewater? <br />4. cooling water (contact and noncontact)? <br />If yes. identify sources, volumes, quality (ii other than normal domestic sewage). <br />and treatment methods. Give the basis or methodology of estimates. <br /> <br /> No ~ Yes <br />No Yes <br />No Yes <br />No Yes <br /> <br />See Attachment (p.xv) <br /> <br />b. Identify receiving waters, including groundwater, and evaluate the impacts of the <br /> discharges listed above. If discharges to groundwater are anticipated, provide per- <br /> colation/permeability and other hydrogeological test data, if available. <br /> <br />23. <br /> <br />Will the project generate (either during or after construction): <br />a. air pollution? <br />b. dust? <br />c. noise? <br />d. odors? <br />If yes, explain, including as appropriate: distances to sensitive land uses: expected lev- <br />els and duration of noise: types and quantities of air pollutants from stacks, mobile <br />sources, and fugitive emissions (dust); odor sources; and mitigative measures for any <br />impacts. Give the basis or methodology of estimates. <br /> <br /> No ~ Yes <br />No Yes <br />No Yes <br />b~ No Yes <br /> <br />See Attachment (p.xvii) <br /> <br />3 <br /> <br /> <br />