Laserfiche WebLink
66264 <br /> <br />until the State advises the City in writing of its concurrence <br />therein. <br /> <br />Section C. Cancellation of Aqreement <br /> <br />Each party to this agreement reserves the right to withdraw from <br />and cancel this agreement within 30 days after the opening of <br />bids if either party determines any or all bids to be <br />unsatisfactory; the withdrawal from or cancellation of the <br />agreement shall be accomplished by either party serving a written <br />notice thereof upon the other. <br /> <br />Section D. Direction, Supervision and Inspection of Construction <br />The contract construction shall be under the direction of the <br />City, and under the supervision of a registered professional <br />engineer; however, the State cost participation construction <br />covered under this agreement shall be open to-inspection by the <br />State's District Engineer at Golden Valley or his authorized <br />representatives. In addition, the City shall give the District <br />Engineer five days notice of its intention to start the contract <br />construction. <br /> <br />The responsibility for the control of materials for the State <br />cost participation construction covered under this agreement <br />shall be on the City and its contractor and shall be carried out <br />in accordance with Specifications No. 1601 through and including <br /> <br />-4- <br /> <br /> <br />