Laserfiche WebLink
66264 <br /> <br />construction contract and/or construction contract "Change <br />Orders" or "Supplemental Agreements" approved by the State's <br />District Engineer. <br /> <br />A SCHEDULE "I" which lists all of the anticipated State cost <br />participation construction and construction engineering items <br />covered under this agreement, is attached hereto and made a part <br />hereof by reference. <br /> <br />Ail liquidated damages assessed the City's contractor in <br />connection with the construction contract shall result in a <br />credit shared by the City and the State in the same proportion as <br />their total construction cost share covered under this agreement <br />is to the total contract construction cost without any deduction <br />for liquidated damages. <br /> <br />STATE COST PARTICIPATION CONSTRUCTION <br /> <br />12.2 PERCENT <br /> <br />All of the cooperative joint-use storm sewer facilities <br />construction and other associated construction to be performed <br />upon, along and adjacent to Trunk Highway No. 10 at County Road <br />No. 57 (Sunfish Lake Boulevard) within the corporate City limits <br />under State Project No.' 0202-68 (T.H. 10=003). Said construction <br />includes but is not limited to those construction items as <br />described and tabulated on Sheet No. 2 of the attached Schedule <br /> <br />-7- <br /> <br /> <br />