Laserfiche WebLink
Mr. Ron Hetlund <br />Page 2 <br />September 25, 1989 <br /> <br />Several items the Parks Commission' should be aware of: <br /> <br />Anoka County is currently negotiating to acquire approximately <br />the south half of the parcel for County Park. <br /> <br />2) <br /> <br />If acquisition is completed, the trail will extend through <br />county park land and will not need to be dedicated to the <br />City. <br /> <br />EQB regulations for the Critical River corridor require <br />minimum lot sizes of 5 acres rather than the proposed 2.5 <br />acres. <br /> <br />4) <br /> <br />The EQB lot sizes would reduce park dedication requirements <br />in the residential area from 10% to 7% based on density. <br /> <br />The proposed Mississippi River Crossing is shown as a 200' <br />corridor. This will be sho%~n as a 500' corridor, a portion <br />of which would be used for the road itself. Addiuional righu- <br /> . ~_all link <br />cf-way may be required to provide a connecting ~ ' <br />across the bridge (approximately one acre at 580'x75'). <br /> <br />The Parks Commission may wish to reserve the right to review the <br />proposed plat and revise its recommendation if the County Park <br />acquisition is completed or if it's changed substantially. <br /> <br />if you have any questions in regard to the proposed development, <br />let us know. <br /> <br />Sincerely, <br /> <br />P~KANSON ANDERSON ASSOCIATES, INC. <br /> <br />Merland Otto <br /> <br />cc: <br /> <br />File: <br /> <br />Mr. James Martin <br /> RA2:t5-I!5 <br /> <br /> <br />