Laserfiche WebLink
SCHEDULE "B" - STREET CONSTRUCTION - ~ ~ - IMP. PROJ. '88-9 <br />S.A.P. 199-108-02 <br /> ~-timated Used <br /> <br />Extermion <br /> <br />3. 2104. 505 Remove Bit. Pavement 2,160 <br />4. 2104.501 C~%mon Ex_cavation 13,300 <br />5. 2112.501 Subgrade Preparation 47.7 <br />6. 2211.501 A~te Base, CL5 7,830 <br />7. 2331.504 Bit. Material for Mix. 284.0 <br />8. 2331.514 Base Course M~ 2,700 <br />9. 2341.508 Wearing Coorse Mix. 1,960 <br />10. 2341.518 Bit. Mix for Driveway Pavement 60 <br />11. 2357.502 Bit. Mat. for Tack fl)at 2,370 <br />12. 2501.511 24" (I~ Pipe Oalvert 40 <br />13. 2506.522 A~j. ~ & ~ Castir~ 18 <br />14. 2531.501 B618 Conc. C%lrb & Gh~ter 9,350 <br />15. 2575.501 Roadside Seeding 4.5 <br />16. 2575.502 Seed MixO/re 5 335 <br />17. 2575.505 So~Lir~ 1,150 <br />18. 2575.511 Mulch Material, Type I 11 <br />19. 2575.511 Comm. Fert. 20-10-10 1.65 <br />20..Spec. Centerl~e Pave. Marking 4,960 <br />21. Spec. Edge of %~avel I/~. F~3rkir~ 9,700 <br />22. 2105.535 Place Topsoil f%-om Stockp~e 2,770 <br />23. 2575.501 Seedir~ 1 <br />24. Spec. Concrete Valley Gutter* 50 <br />25. Spec. cone. Triangular Valley Suttar* 2 <br />26. Spec. Conc. Driveway Aprons* 100 <br /> <br />AC 1 AC $1,250.00 /AC <br />AC 1 AC $1,250.00 /AC <br />SY 4000 SY $1.00 /SY <br />CY 14100 CY $0.80 /CY <br />RS 47.7 RS $75.00 /RS <br />T 8080 T $4.90 /T <br />T 273.4 T $154.50 /T <br />T 2843 T $9.50 /T <br />T 2135 T $11.10 /T <br />T 105 T $45.00 /T <br />~L 410 ~L $0.95 /~L <br />LF 40 k~ $17.00 /LF <br />EA 20 EA $12o.oo <br />LF 9288 LF $3.90 /LF <br />AC 5 AC $350.00 /AC <br />LB 410 LB $2.50 /LB <br />SY 3600 SY $2.00 /SY <br />T 11 T $350.00 /T <br />T 1.4 T $300.00 /T <br />I~ 4490 I~~ $0.14 /I~~ <br />~ s7so ~ $o.1~. /~ <br />CY 3370 CY $0.80 /CY <br />AC 0.5 AC $350.00 /AC <br />LF 45 LF $13.50 /LF <br />EAa% 2 EA $490.00 <br />LF 132 LF $17.50 /LF <br /> <br />TC~ SCH~ 'lB": <br /> <br />SCHEDULE "C" - STO~4 SEWER - SUNFISH LAKE BLVD. N.W. - S.A.P. 199-113-01 <br /> Estimated Used <br />Item Depth Quantity to Date Unit Price <br /> <br /> $i,250.00 <br /> $1,25o.o0 <br />$4,OOO.OO <br />$11.280.00 <br />$3.577.50 <br />$39.5~2.00 <br />$42 240.30 <br />$27,008.50 <br />$23,698.50 <br />$4,725.00 <br />$389.50 <br /> $68o.oo <br />$2,400.00 <br />$36,223.20 <br />$1,750.00 <br />$1,025.00 <br />$7,200.00 <br />$3,850.00 <br />$420.00 <br />S628.60 <br />$1,229.20 <br />$2,696.00 <br />$175.00 <br />$607.50 <br /> $980.00 <br /> $2,310.00 <br /> <br />$221,185.80 <br /> <br />Extension <br /> <br />1. 2503.511 18" RCPClassV Varies 120 LF 177 <br />2. 2503.511 48" RCP Class III Varies 580 LF 579 <br />3. 2506.508 Manholes - 48" Dia. 0-8' lEA 1 <br />4. 2506.508 Manholes - 72" Dia. 0-8' 3 EA 3 <br />5. 2506.506 Extra Depth for 72" Dia. MH 5 LF 3 <br /> <br />%UTAL SC~IEELrLE "C": <br /> <br /> $19.oo /LF <br /> $5s.oo/~ <br /> $950.00/EA <br />$1,765.00 <br /> $15o.oo/~ <br /> <br />$3,363.00 <br />$33,582.00 <br /> $95o.0o <br /> $5,295.00 <br /> $45o.oo <br /> <br />$43,640.00 <br /> <br />*Per Crmnge Order No. 1 <br /> <br /> <br />