My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/03/2013
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 10/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:18:30 AM
Creation date
10/3/2013 11:14:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/03/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attached Documents / Drawings: <br />Survey: <br />A survey prepared by Northstar Surveying, Inc. of Litchfield, MN, dated 8 -7 -2008, <br />including two sheets; is attached for review <br />Site Plans: <br />Sheet SR -1 (Aerial Photo / Overlay) prepared by Framework Architects, is attached <br />Sheet SR -2 (Site Construction Plan) prepared by Framework Architects, is attached <br />Sheet SR -3 (Surface Calculations) prepared by Framework Architects, is attached <br />Architectural Drawings: <br />Sheet A -2 (Demolition Plan) prepared by Framework Architects, is attached <br />Sheet A -3 (Floor Plan) prepared by Framework Architects, is attached <br />Sheet A -6 (Building Elevations) prepared by Framework Architects, is attached <br />A color- rendered image of the building and proposed addition, will be provided as <br />part of the Site Plan submittal package <br />Equipment Plan: <br />A preliminary equipment plan, prepared by Standley Batch Systems, Inc. is attached <br />Utility and Grading Plan: <br />A copy of Civil Engineering drawings (sheets C1, C2 and C3), dated 04- 09 -01; <br />prepared by Brown Herkenhoff Engineers — Surveyors, of Sauk Rapids, MN; are <br />attached <br />These Civil Engineering drawings illustrate the site grading and utility improvements <br />constructed during the last major building expansion completed on the property. <br />No substantial changes to the existing grades, or to site utilities, are being proposed. <br />We are proposing that new Utility and Grading plans not be required for this project. <br />Landscape Plan / Tree Removals Plan: <br />No tree removal is anticipated; and no new landscaping (trees, shrubs, irrigation, <br />etc.) will be included in the proposed project. We propose that a Landscape Plan / <br />Tree Preservation Plan not be required for this project. <br />Lighting Plan: <br />A site lighting and photometric plan will be provided as part of the Site Plan submittal <br />package. <br />End of Exhibit <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.