Laserfiche WebLink
Overall Cost Estimate <br />1ProjecL Sunwood Retail Common Improvements <br />IRamsev, MN <br />Item <br />Mobilization <br />Clearing 8 Erosion Control <br />Grading 1 Earthwork <br />Bitumnous Pavement wl Aggregate Base <br />Concrete Pavement wl Aggregate Base <br />Curb 8 Gutter <br />Stone Sesser (induning Stomwater Treatment) <br />Sanitary Sewer (including Dewatedng) <br />Watemrain <br />Lighting <br />Imdstaping (Tree's. Seed) <br />HRA HRA WISER CHOICE McDONALDS SUPERAMERICA <br />(LOT 18 2, BLOCK 1) (COSTS ASSOC, it LOT 4, BLOCK I) (LOT 3, BLOCK 1) (LOT 4, BLOCK 1) (LOT 5, BLOCK 1) <br />3,000 <br />1,719 <br />2, <br />144 <br />6,404 <br />560 <br />8,041 <br />3,083 <br />24,905 <br />29,f831 <br />15,6801 <br />13,1301 <br />57,993 <br />3,0(10 <br />2,057 <br />2,428 <br />14, <br />re, <br />2,534 <br />29,606 <br />14,918 <br />69,242 <br />TF <br />R <br />RAMSEY. MIMMSSOTM <br />I Total Price <br />3,000 3,000 12,000 <br />2,641 2,756 9,173 <br />2,944 3,069 10,540 <br />13,641 9,581 37,920 <br />6,404 <br />2,590 5,684 <br />- I 26,311 I 85,100 <br />- I 14,9201 30,600 <br />13,130 1 26260 <br />16,029 1 13,913 1 52,900 <br />27 I 21 3,130 <br />40,870 86,700 279,711 <br />10% Contingency <br />Subtotal <br />20%IrdrectCosts <br />Grand Total <br />S27,971.14 <br />S301,682.50 <br />$64,613.32 <br />5372,295,82 <br />EXHIBIT E <br />