My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/22/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 10/22/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:39:28 AM
Creation date
10/23/2013 8:22:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Streets <br />b. Concrete curb and gutter <br />c. Street traffic control devices <br />d. Lot grading <br />e. Sidewalks <br />f. Boulevard sodding <br />g. Trunk and lateral sanitary sewer <br />h. Trunk and lateral water main <br />i. Storm drainage facilities <br />j. Trail development <br />k. Electricity (within one-fourth mile) <br />1. Phone (within one-fourth mile) <br />m. Natural gas (within one-fourth mile) <br />n. Water shut off boxes <br />(the "Stage I Improvements"). <br />The PERMITTEE agrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />CITY Code. <br />4. Additional Requirements Related to Certain Stage I Improvements. This <br />paragraph intentionally deleted. <br />5. Lot Corner Staking. The PERMITTEE must install lot corner stakes at all lot <br />corners. <br />6. Stage I Improvement Financial Guarantee. NOTE: this section will be completed <br />prior to Final Plat Approval when Construction Documents are prepared for <br />review. The PERMITTEE shall provide a financial guarantee to the CITY <br />guaranteeing the construction of the Stage I Improvements and their timely <br />completion. The PERMITTEE shall be responsible for a financial guarantee in <br />the amount of Dollars and No Cents ($ .00), which amount is <br />125% of the CITY Engineer's estimated cost of the Stage I Improvements. Upon <br />completion of Stage I Improvements (including the removal of "temporary" <br />erosion control measures as identified in the approved Grading Plan), acceptance <br />by the CITY, supported by appropriate lien waivers, The PERMITTEE may <br />request a reduction in the amount of the financial guarantee. <br />7. Inspection Fees for the Stage I Improvements. NOTE: this section will be <br />completed prior to Final Plat Approval when Construction Documents are <br />prepared for review. The PERMITTEE shall provide an inspection fee to the <br />CITY to inspect the Stage I Improvements. The PERMITTEE shall be <br />responsible for an inspection fee in the amount of Dollars and No <br />Cents ($ .00), which amount is 5% of the City Engineer's estimated cost of <br />the Stage I Improvements. The inspection fee must be in the form of a cash <br />escrow. The PERMITTEE may request a refund of the remaining balance in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.