My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/29/2013
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2013
>
Agenda - Council Work Session - 10/29/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:39:52 AM
Creation date
10/30/2013 12:19:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/29/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Process Approved by the Council in July of 2013 <br />Alternative 3: Hybrid Process <br />A hybrid, collaborative process could be considered that included elements of desired structure of a <br />traditional process with the collaborative environment of Open Space Technology. A suggested approach <br />would allow participants to set the agenda and convene sessions. In other words, the agenda would not <br />be set by the City or a facilitator ahead of time. An initial Scoping Meeting would be held to review the <br />current status of the project and the purpose of the study group. Rather than hosting several, parallel <br />sessions as with the case with Open Space Technology, the group would convene as a single group <br />throughout the process. The group would come to a consensus as to the agenda and topics as part of the <br />initial Scoping Meeting, but could amend depending on conversation throughout. This process would <br />entail that the agenda be prepared by participants at the onset of the process and aareed to a structured <br />outline for the process as part of the scooina meetina and individual sessions coordinated by participants <br />with a greater decree of assistance from City Staff. <br />Benefits: This process balances an open, transparent, and collaborative process with a well defined <br />structure that is developed by participants rather than the City or a facilitator. Following the initial Scoping <br />Meeting, Staff can report back with a better estimate of time and costs based on an agenda prepared by <br />the Study Group. With a slightly more structure approach to the Open Space Technology concept, Staff <br />estimates that this process would be slightly shorter than said approach. <br />Drawbacks: This process will require that the initial Scoping Meeting be completed before a more <br />concrete estimation of costs and timelines when compared to a traditional, structured Study Group. It is <br />estimated that this process will be a slightly longer timeframe that the traditional, structured process, <br />consisting of possibly one (1) to two (2) additional meetings. <br />Project Summary— I-ormer Municipal center (lu/2 i/ii) <br />
The URL can be used to link to this page
Your browser does not support the video tag.