My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/10/1990
Ramsey
>
Public
>
Agendas
>
Council
>
1990
>
Agenda - Council - 04/10/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:48:08 AM
Creation date
12/2/2003 3:15:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/10/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br />CITY HALL PARKING LOT IMPROVEMENTS <br /> By: Pete Raatikka, City Engineer <br /> <br />Background: <br /> <br />As discussed at the March 27, 1990 City Council meeting, the Fire Department will be taking over <br />the garage space at City Hall this summer. Therefore, City vehicles will have to be stored outside. <br /> <br />To facilitate vehicle storage outside, it is proposed to construct a paved parking lot enclosed with a <br />six foot high chain link fence. It is also proposed to construct an access road to 153rd Avenue <br />N.W. from the fire barn and also provide additional parking areas for the volunteer firemen. <br /> <br />As requested, we have estimated the construction cost of the improvements as follows: <br /> <br />A. Parking Area <br /> <br />Bituminous surfacing <br />Gravel base <br />Concrete curb stops (next to fire barn) <br />Fencing <br />Electrical plug-ins <br /> <br />$ 3,200.00 <br />$ 1,600.00 <br />$ 500.00 <br />$ 4,000.00 <br />$ 1,S00.00 <br /> <br />Total Estimated Cost Parking Area: <br /> <br />$11,100.00 <br /> <br />A~¢0~ Road to 153rd Avenue N.W, <br />1. 24 FOOt Wide Rural Section <br /> <br /> Bituminous <br /> Gravel base <br /> <br /> Total Est. Cost of Rural Section: <br /> <br />2. 32 Foot Wide Urban Section <br /> <br /> Bituminous <br /> Gravel base <br /> Curb and gutter <br /> <br /> Total Est. Cost of Urban Section: <br /> <br />$ 6,500.00 <br />$ 3,70O.00 <br /> <br />$10,200.00 <br /> <br />$ 7,500.00 <br />$ 4,100.00 <br />$ 6,500.00 <br /> <br />$18,100.00 <br /> <br />In addition to the above, the City may wish to consider overlaying the existing driveway and <br />parking areas at City Hall. The estimated cost of a 1-1/2 inch bituminous overlay is $13,200.00. <br /> <br />Should the City elect to proceed with part or all of the proposed improvements, a grading and <br />drainage plan of the improvement area should be completed. I have estimated the cost of a grading <br />and drainage plan which would include a topographic survey of the entire City Hall property be <br />$3,800.00 <br /> <br />It is proposed that the Public Works Department will do all the grading for the proposed <br />improvements. The Public Works Department could also install the gravel base for both the access <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.