My WebLink
|
Help
|
About
|
Sign Out
Home
11/12/13
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2013
>
11/12/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:27:51 AM
Creation date
11/15/2013 9:51:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HRA Regular Session <br />Meeting Date: 11/12/2013 <br />By: Tim Gladhill, Community Development <br />Information <br />5. 2. <br />Title: <br />Approve Work Order for Installation of Sign in COR TWO/Sunwood Retail Area per Real Estate Contract with <br />McDonald's USA, LLC <br />Purpose/Background: <br />On December 19, 2012, the HRA entered into a Real Estate Contract with McDonald's USA, LLC for the purchase <br />of Lot 2, Block 1, COR TWO. The Contract is attached to this case. Per Paragraph 12 of the Contract, the HRA is <br />responsible for constructing two (2) signs: <br />1. Southeast corner of Sunwood Drive and Armstrong Boulevard, on Lot 2 (McDonald's Site) (150 square feet) <br />2. At the easterly shared entrance of Lots 1-3, Block 1 COR TWO, on Lot 3 (Convenience Gas Location) (75 <br />square feet) <br />These two (2) signs will be shared by Lots 1-3, Block 1, COR TWO. Each lot would have one (1) tenant panel on <br />each sign. The signs are illustrated in Exhibts D of the Contract. It is anticipated that the cost of the sign will be <br />divided evenly between the three (3) lots. Under the Contract, McDonald's has agreed to pay for a third of the cost <br />of construction. The remaining two-thirds (2/3) would be anticipated to be reimbursed at time of sale of those two <br />(2) lots. The interim funding for the remaining two-thirds (2/3) would be the land sale proceeds from the <br />McDonald's sale. <br />The proposed signs comply with the approved Master Sign Plan for The COR. Staff is proposing that the proposed <br />Kasota Stone/Limestone face be constructed as Dryvit as a cost savings alternative. Dryvit is a plaster finish similar <br />to Stucco that can be finished to provide a similar look to the original design of The COR Master Sign Plan. <br />Staff requested quotes from approximately five (5) sign vendors and received responses from two (2) sign vendors. <br />Staff requested quotes for a Kasota Stone finish as original contemplated in the Master Sign Plan. In addition, Staff <br />requested that vendors provide a lower -cost alternative to Kasota Stone. A summary of quotes is attached to this <br />case for review. The lowest quote was provided by DeMars Signs with an estimated cost of $75,000 (when <br />factoring electrical connection services). Please note: this quote does not include the planter as shown on the <br />attached drawings. The HRA could add said planter at an additional cost of $5,000. <br />It is hereby noted that the electrical service construction is still estimated and will need to come back under separate <br />contract at a future date. Both quotes received note that the electrical service connection is to be done by others. <br />Staff has received verbal quotes of $15,000 and is generally comfortable with said quotes. It is anticipated that this <br />price may reduce once site conditions are better understood. However, Staff will secure at least three (3) quotes for <br />electrical service and bring that component back for approval at a future date. <br />Notification: <br />No notification is required. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.