My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/12/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 11/12/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:40:01 AM
Creation date
11/15/2013 10:43:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe how the proposed site assessment work plan, feasibility study, and/or remedial <br />alternatives to be considered will incorporate green remediation practices. <br />All contractors will minimize the number of trips to the site and will use electronic documents for all <br />correspondence. The two vendors that have been selected to conduct work on the site are located <br />locally (one in Ramsey and one in neighboring Anoka). <br />The contractor selected to complete the RAP will evaluate their process to minimize the amount of <br />soil that needs to be removed; and, attempt to identify how the property could be utilized to reduce <br />the impact of contaminated soils on future users. <br />Asbestos abatement plan contractor will specify recycling of material versus disposal. For example, <br />by using abatement plans as proposed by the contractor, 30% more concrete could be recycled; <br />rather than wasting material (estimated). <br />What green remediation practices will be incorporated within the proposed assessment <br />work plan, feasibility study, and/or remedial alternatives analysis? <br />Same as above. More/specific information will be available in next step of the process — <br />demolition of building and site cleanup (if needed). <br />What measures or metrics will be included within the environmental investigation <br />documentation to assess green remediation practices? <br />NA. More/specific information will be available in next step of the process —demolition of <br />building and site cleanup (if needed). <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.