Laserfiche WebLink
xi. Irrigation rain sensors shall be installed and appropriately placed <br />throughout the development. <br />xii. Establishment of turn in areas disturbed during construction and in <br />accordance with the Landscape Plan. <br />xiii. Natural gas utility lines (to be constructed by a third party service <br />provider at the direction of Secondary Developer). <br />xiv. Electrical utility lines (to be constructed by a third party service <br />provider at the direction of Secondary Developer). <br />xv. Telephone utility lines (to be constructed by a third party service <br />provider at the direction of Secondary Developer). <br />b. In addition to and separate from the Required Improvements —Site Plan, <br />the City requires the Secondary Developer to construct or be responsible for the <br />construction of other improvements as follows ("Stage I Improvements —Plat"): <br />i. That portion of Zeolite Street NW south of Sunwood Drive <br />together with a temporary cul-de-sac along Civic Center Drive. <br />ii. Trunk sanitary sewer, watermains and stormwater improvements in <br />that portion of Zeolite Street NW referenced above. <br />iii. Streetscape construction along the south side of Sunwood Drive <br />NW adjacent to the Subject Property and the west side of Zeolite <br />Street NW adjacent to the Subject Property. <br />c. The definition of "Improvements" under this Development Contract shall <br />include both the Required Improvements --Site Plan and Stage I Improvements —Plat. <br />The Required Improvements —Site Plan shall not include and shall be separate and <br />distinct from the Stage I Improvements —Plat. <br />d. The Improvements shall be installed in accordance with the Final Plans <br />and in accordance with City standards, City Code and plans and specifications which <br />have been prepared by a competent, registered professional engineer and approved by the <br />City Engineer. The Secondary Developer shall obtain all necessary permits from all <br />agencies before proceeding with construction. <br />e. Secondary Developer shall construct the Required Improvements —Site <br />Plan at its cost and expense. Secondary Developer shall also construct the Stage I <br />Improvements — Plat at the its cost and expense unless otherwise agreed to by the City <br />and Secondary Developer. <br />f. The Improvements shall be constructed in accordance with the Final <br />Plans. <br />g. Notwithstanding the conditions set forth in Section 7.8 of the Master <br />Development Agreement, the Secondary Developer shall be able to commence <br />construction of the Stage I Improvements —Plat upon the recording of the Plat and <br />payment of fees as required herein, and shall thereafter be able to complete these <br />Ramsey Town Center 3rd Addition <br />Development Contract <br />Page 4 of 17 Pages <br />