My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/12/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 11/12/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:40:01 AM
Creation date
11/15/2013 10:43:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(in) surface water quality, <br />(iv) storm water controls, erosion controls and drainage, <br />(v) street and lot layout, <br />(vi) utilities, <br />(vu) landscaping, <br />(vrri) basement elevations, <br />(ix) signage, <br />(x) easements for public utilities, <br />(xi) parking <br />(xii) building location and extenor building design and appearance <br />(z) Final Plat "Final Plat" means the Master Final Plat and the final plat the City <br />approves for each Phase in accordance with the RTC Controls <br />(aa) Force Maieure "Force Majeure" means acts of God, including, but not limited to, <br />floods, ice storms, blizzards, tornadoes, landslides, lightning and earthquakes (but <br />not including reasonably anticipated weather conditions for the geographic area), <br />riots, insurrections, war or civil disorder affecting the performance of work, <br />blockades, power or other utility failures, fires or explosions, labor strikes or <br />labor shortages and shortage of materials If a party's performance of an <br />obligation under this Master Agreement is expressly made subject to Force <br />Majeure and the party is unable to perform the obligation within the time period <br />set forth in this Master Agreement as the result of an occurrence of a Force <br />Majeure, the time penod in which the party is obligated to perfoiiri the obligation <br />is extended during the continuance of the Force Majeure and a reasonable penod <br />for recovery or restoration thereafter <br />(bb) Formal Notice "Formal Notice" means notices given by one party to the other if <br />in wnting and if and when delivered or tendered either in pet son or by depositing <br />it in the United States mail for delivery via certified mail, ieturn receipt requested, <br />with postage and postal charges prepaid, addressed as follows <br />If to City <br />City of Ramsey <br />15153 Nowthen Blvd <br />Ramsey, MN 55303 <br />Attention City Administrator <br />1555730v13 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.