My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/12/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 11/12/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:40:01 AM
Creation date
11/15/2013 10:43:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
91 <br />states <br />ARTICLE 9 <br />PARKING STRUCTURES <br />PARKING STRUCTURES Section 9 20 31, Subd 2(a) of the RTC Ordinance <br />To maximize the use of land and prevent proliferation of surface parking <br />within this Distnct, parking structures will be utilized to accommodate the <br />majority of the District's parking needs <br />The Developer acknowledges and agrees that the City may refuse to approve Final Plans for <br />Development of all or any portion of the Subject Property located within the TC-1 Mixed Use <br />Core Sub -District unless sufficient structured parking already exists to satisfy the parking <br />requnr ements for the improvements that may be constructed pursuant to the Final Plans for that <br />Phase or the Final Plans for that Phase provide for the construction of structured parking which is <br />acceptable to the City, or the City has commenced construction of the Phase I Parking Ramp <br />pursuant to Section 9 4 and, upon completion thereof, sufficient structured parking will exist to <br />satisfy the parking requirements for the improvements that may be constructed pursuant to the <br />Final Plans for that Phase <br />9 2 PHASING OF STRUCTURED PARKING The Master Development Plan <br />contemplates the construction of three parking ramps within the TC-1 Mixed Use Core Sub - <br />District The City and the Developer have agreed upon a mechanism for financing the City's <br />construction of the approximately 1,150 stall parking ramp descnbed in the Master Development <br />Plans (the "Phase I Parking Ramp") as set forth in this Article 9 The City agrees that unless and <br />until the City initiates construction of the Phase I Parking Ramp pursuant to Section 9 4, the City <br />will consider proposals from the Developer or Secondary Developers for alternative methods of <br />providing for the financing and construction of the Phase I Parking Ramp At this time, the City <br />and the Developer have been unable to agree on a method to provide for the financing and <br />construction of the other two parking ramps descnbed in the Master Development Plan The <br />portion of the Master Development Plan that depicts the size and location of the Phase I Packing <br />Ramp and the other two parking ramps will control the location and design of the Phase 1 <br />Parking Ramp and the other two parking ramps unless the Developer and the City, in the <br />amendment to this Master Agreement, or the City and a Secondary Developer, in a Secondary <br />Development Agreement, agree to modify the designs or locations set forth in the Master <br />Development Plans Notwithstanding the foregoing, the City may unilaterally alter the size and <br />design of the Phase I Parking Ramp to the extent necessary to allow the City to construct the <br />Phase I Parking Ramp for an amount not to exceed $12,000,000 <br />9 3 CONSTRUCTION OF PHASE 1 PARKING RAMP— DEVELOPER <br />INITIATIVE The Developer may, by Formal Notice to the City, obligate the City to commence <br />design and construction of the Phase I Parking Ramp upon the Developer's satisfaction of the <br />following conditions precedent <br />(a) <br />The Developer's submission to the City and the City's approval, tot purposes of <br />this Section 9 3 only, of preliminary Final Plans for the Development of one or <br />more Phases within the TC-1 Mixed Use Core Sub -District which will rely on the <br />1555730v13 <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.