above contracted construction costs), and up to $13,858 may be directed back to the Park Trust Fund. <br />. Additionally, it is noteworthy to point out that the Class-V aggregate base for the trail (loaded and hauled by <br />the contractor), was specified for the project from that material acquired as part of the Bury and Carlson early <br />lease termination agreement. This has now been documented to have saved the city $11,844 on the first <br />project for which this material was specified. <br />This project must be complete, with all expenses incurred and paid for, before the end of June 2014 in order to <br />receive DNR reimbursement. Liquidated Damages in an amount up to $100,000 are included within the contract <br />documents to ensure this project is completed on time. Additionally, approval by Council of the Resolution and this <br />case, shall be direction to Staff to identify with the contractor a programmatic project schedule which shall be <br />referenced within the contract. This mutually agreed upon schedule shall be 'extra' enforceable insurance that the <br />City's project remains a priority of the contractor, and thus assures success. <br />The City is required to award the project to the lowest "qualified" bidder. Past project performance issues with any <br />particular contractor do not by themselves mean that they are not qualified to receive the bid. Their have been some <br />issues apparent on other projects involving the low bidder, however, City needs to enforce performance through the <br />contract, inspections, and financial guarantees. Staff will be prepared to answer questions about this process as <br />desired. <br />Funding Source: <br />Primary funding is from the Minnesota DNR's Local Trail Connections program in the amount of $100,000. <br />The balance of the costs will be from the Park Trust Fund which had a beginning -year balance of approximately $2 <br />million dollars. The precise amount is yet to be identified as some contracted engineering costs will be expensed <br />from the fund for construction staking etc.; and thereafter, grant reimbursements (50%) will be sought for <br />administration and engineering - with the net impact to the Park Trust Fund estimated to be between $72,283 and <br />$86,141.02. <br />Recommendation: <br />Staff recommends approving Resolution #13-11-187 accepting the bid and awarding the contract for the <br />construction of the Central Park to Alpine Drive Trail. <br />Action: <br />Motion to approve Resolution #13-11-187 accepting the bid and awarding the contract for the construction of the <br />Central Park to Alpine Drive Trail to North Metro Asphalt & Contracting. <br />Attachments <br />Trail location exhibit <br />award memo <br />Resolution #13-11-187 <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 11/06/2013 02:25 PM <br />Kurt Ulrich Kurt Ulrich 11/07/2013 03:24 PM <br />Form Started By: Mark Riverblood Started On: 10/31/2013 03:23 PM <br />Final Approval Date: 11/07/2013 <br />