My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Parks and Recreation Commission - 10/10/2013
Ramsey
>
Public
>
Minutes
>
Parks and Recreation Commission
>
2013
>
Minutes - Parks and Recreation Commission - 10/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:32:54 AM
Creation date
11/18/2013 9:40:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Parks and Recreation Commission
Document Date
10/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks & Assistant Public Works Superintendent Riverblood noted on the trail connection above, <br /> this may be a near -term reality by virtue of the platting of Brookfield 4 Addition in two <br /> respects. The first is that the present value of the platting of 77 lots represents $190,575 in cash <br /> Park Dedication. The Commission may make effective recommendation to City Council that <br /> these proceeds be held within the Park Trust Fund for the purpose of constructing the Trott <br /> Brook Trail from Brookfield to Variolite when a trail route (easement) is secured and full <br /> funding is available. The second aspect of a near -term opportunity to construct the above trail is <br /> that 21St Century Bank owns the land west of the proposed Brookfield 4 Addition, and has <br /> conceptually agreed to convey necessary trail easements to ultimately provide for the <br /> construction of this portion of the Trott Brook Trail (pending full funding). Discussions with the <br /> bank, developer and staff have acknowledged that if this trail easement is in place, staff may <br /> apply for a DNR trail grant as soon as 2014 to potentially bring an additional $100,000 in needed <br /> external funding to this proposed extension of the Trott Brook Trail. The preliminary estimate <br /> for the extension of the Trott Brook Trail is a range of $300,000 to $400,000 for the boardwalk <br /> segments and $45,000 to $55,000 for those areas of this trail that can be constructed of <br /> bituminous. <br /> Trail Fees <br /> Riverblood reviewed relative to Trail Fees, staff is recommending a cash contribution (present <br /> value) of $46,200. These funds could also be directed to the Trott Brook Trail from the <br /> Brookfield are to Variolite Street after one connecting link may be established within the existing <br /> plat (Brookfield 3r Addition) and is shown on the attachment entitled "Trott Brook Trail to 170 <br /> St. Trail ". As in the instance with the trail easement mentioned above, 21s Century Bank has <br /> verbally agreed to convey fee -title this outlot to the city (this outlot already has drainage and <br /> utility easement encumbrances upon it). The estimated construction cost of this short connecting <br /> trail segment is $6,000. <br /> Staff recommends that Park Dedication and Trail Fees are satisfied by cash payment at the time <br /> of Final Plat Recording and that the Development Agreement include an Exhibit consisting of a <br /> Letter, or Memorandum of Understanding that 21S Century Bank shall convey to the City, a trail <br /> easement from a publicly assessable point within Brookfield 3r Addition, generally westward to <br /> the City Trail Corridor adjoining 21s Century Bank's holdings, for the purpose of future <br /> construction of the Trott Brook Trail and that the development agreement shall include that Park <br /> Dedication and Trail Fee proceeds from the Brookfield 4 Addition will be applied to the Trott <br /> Brook Trail, with the City applying for grant funds to supplement the Park Dedication and Trail <br /> Fee "gap" in funding for the Trott Brook Trail west of the Brookfield Addition. <br /> Motion by Commissioner Fyten, seconded by Commissioner Chubb, to recommend to City <br /> Council that Park Dedication and Trail Fees are satisfied by cash payment at the time of Final <br /> Plat Recording, and that the Development Agreement include an Exhibit consisting of a Letter or <br /> Memorandum of Understanding that 21St Century Bank shall convey to the City, a trail easement <br /> from a publicly accessible point within Brookfield 3 Addition, generally westward to the City <br /> Trail Corridor adjoining 21S Century Bank's holdings, for the purpose of future construction of <br /> the Trott Brook Trail and that the development agreement shall include that Park Dedication and <br /> Trail Fee proceeds from the Brookfield 4 Addition will be applied to the Trott Brook Trail, with <br /> Park and Recreation Commission October 10, 2013 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.