Laserfiche WebLink
LAYOUT CHANGES <br /> <br />SQUAD ROON <br /> <br />1. Move the forms storage cabinet from its present location to <br /> the wall between the shower door and the washroom door. <br /> <br />2. Leave the copy machine and file cabinet were it is presently <br />located. <br /> <br />3. Remove the table that is currently in the squad room. <br /> <br />4. Move the desk that is located on the north wall to the east <br />wall. <br /> <br />5. Mount the closet clothes rod and shelf unit on the east wall <br />next to the window. <br /> <br />6. New cabinet for equipment and officer's mailboxes to be <br />mounted on the east wall. <br /> <br />7. TI terminal to be placed on the desk. <br /> <br />8. The printer from the front office, that is dedicated to the <br />state line, will be located next to the desk. <br /> <br />9. The printer for reports will be next to the state line <br />dedicated printer. <br /> <br />10. Telephone will be on the desk. <br /> <br />11. Form tray assembly that is now on the patrol desk in the <br />front office will be placed on the desk in this location. <br /> <br />12. TI main frame computer will be moved from the vault room <br />this the squad room. This computer will be located in the corner <br />next copy machine. <br /> <br /> <br />