Laserfiche WebLink
CH/~NGE ORDER NO. 3 <br /> TO <br /> CONSTRUCTION WORK FOR <br />IMPROVEMENT PROJECTS 89-14 AND 87-27 <br />SANITARY SEWER, WATERMAIN, STORM SEWER <br />AND STREETS FOR <br /> JUNIPER WOODS AND WACO STREET <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />June 20, 1990 Hakanson Anderson Assoc., Inc. <br />***************************************************************** <br />The City has decided to add the following work to the contract for <br />this project. <br /> <br />Schedule "E" - Storm Sewer/JuniDer Woods (Imp. Proj. 89-14) <br /> <br />Item Increase <br /> <br />16o Fill in pond at Lot 1, Block 5, Rum Acre <br /> Estates w/2000 CY of borrow @ $2.00/CY <br /> <br />$4,000.00 <br /> <br />Net Change in Schedule "E": <br /> <br />$4,000.00 <br /> <br />TOTAL INCREASE CHANGE ORDER NO. 3: <br /> <br />$4,000°00 <br /> <br />Description and Location of Work: <br /> <br />The proposed change consists of filling in the pond on Lot 1, <br />Block 5, Rum Acre Estates with granular material. All work shall <br />be done in accordance with the contract documents or as directed <br />by the Engineer. <br /> <br />The amount of the Contract will increase by the sum of: Four <br />thousand and 00/100 Dollars ($4,000.00). The Contract total <br />including this change order will be: Two hundred twenty three <br />thousand three hundred seven and 57/100 Dollars ($223,307.57). The <br />contract period provided for completion will be extended seven <br />days. Therefore, the revised completion date shall be August 15, <br />1990. This document will become a supplement to the contract and <br />all provisions will apply hereto. <br /> <br /> <br />