Laserfiche WebLink
SCHEDULE "B" - STREET OONSTRUCTION - 153RD AVENUE <br /> ESTIMATED <br /> <br /> USED UNIT <br />TO DATE PRICE <br /> <br />EXTENSION <br /> <br />1. 2101.511 Clearir~ & G~bbi~g 2 (1/2 LS) <br />2. 2105.501 Cc~m~on Excavation 8050 CY <br />3. 2211.501 Aggregate Base Class 5 2010 T <br />4. 2331.504 Bit. Material for Mix. 55 T <br />5. 2331.514 Base Course Mixture 1005 T <br />6. 2341.504 Bit. Material for Mix. 52 T <br />7. 2341.508 Wearing Course Mixture 800 T <br />8. 2357.502 Bit. Mat. for Tack Coat 460 GAL <br />9. 2531.501 B618 Oonc. Curb & Gutter 4966 LF <br />10. 2575.501 Seeding 2.7 AC <br />11. 2575.511 Mulch Material Type I 5.4 T <br />12. 2575.531 C~. Fertilizer 20-10-10 0.7 T <br />13. Spec Centerline P~vement Markings 2483 LF <br />14. Spec. Edge of Travel Tane Marking 5227 LF <br />15. Spec. Concrete Driveway Apron 96 LF <br />16.. 2104.505 Remove Bit... Pavement 865 SY <br />17. Spec. No Parking Sigr~ 12 EA <br /> <br />2 $0.50 $1.oo <br />8050CY $1.00 $8,050.00 <br />1635 T* $5.50 $8,992.50 <br />55.42 T $130.00 $7,204.60 <br />972.4 T $10.00 $9,724.00 <br />41.59 T $130.00 $5,406.70 <br />793.43 T $12.00 $9,521.16 <br />200 GAL $1.00 $200.00 <br />4827 LF $4.00 $19,308.00 <br />2.4 AC $970.00 $2,328.00 <br />4.8 T $140.00 $672.00 <br />0.59 T $400.00 $236.00 <br />2435 LF $0.20 $487.00 <br />4870 LF $0.20 $974.00 <br />150 LF $9.00 $1,350.00 <br />830 SY $2.00 $1,660.00 <br />12 EA $65.00 $780.00 <br /> <br />TOTAL SCHEEULE "B" - STREET OONSTRUCTION - 153RD AVENUE: <br />*~nis quantity reflects a 15% deduction on 1,733 Tons of Cl-5 that did not pass <br />pass Mn/DOT Specs. 5he act~,al quantity placed on 153rd was 1,895 ton. <br /> <br />$76,894.96 <br /> <br />SCHEDULE "C" - TURN IANES ON T.H. 10 & 169 <br />ITEM <br /> <br />ESTIMATED USED UNIT <br /> <br />EX~i~NSION <br /> <br />1. 2105.507 Subgrade Excavation 600 Cu. Yd. 600 CY $2.00 <br />2. 2105.501 OummonExcavation 775 Cu. Yd. 775 CY $3.00 <br />3. 2211.501Aggrec/ate~Cl~s 5 1380Ton 1600 T $5.50 <br />4. 2331.504 Bituminous Material forM ix 25Ton 26.23 T $130.00 <br />5. 2331.510 Binder f~m/rseMixture 440Ton 460.3 T $12.50 <br />6. 2341.504 Bit. Material for Mixture 15 Ton 14.91 T $130.00 <br />7. 2341.508 Wearing(kxzrseMix. 220 Ton 286.7 T $13.50 <br />8. 2357.502 Bit. Mat. forT ack Coat 135 Gal. 100 GAL $1.00 <br />9. 2575.501 Seeding 0.5Acre 0.5 AC $970.00 <br />10. 2575.511MulchMaterial Type I 1 TOn 1 T $140.00 <br />11. 2575.531 Comm. Fertilizer 20-10-10 0.13 Ton 0.13 T $400.00 <br />12. Spec Tur~T~neMarki~s 900Lin. Ft. 800 LF $0.20 <br />13. Spec. Edge of Travel Lane Marking 1800 Lin. Ft. 1650 LF $0.20 <br />14. 2575.505 Sodding 2460 Sq. Yd. 3020 SY $1.50 <br />15. 2105.522 Select GranularBorrow (LIo 425 Cu. Yd. 425 CY $5.00 <br />16. 2501.511 18" RCPCulvert Class III 155 TJn. Ft. 155 LF $21.50 <br />17. 2501.515 18" RCPApron 1 Each 1 EA $250.00 <br />18. 2501.567 18" CS Safety Apron &GD3128 3 Each 3 EA $450.00 <br />19. Spec. Traffic Control i Lump Sum 100%LS $3,000.00 <br />20. 2104.505 Remove Bit. Pavement 1140 Sq. Yd. 1175 SY $2.00 <br />21. Pavement Message (Lt. Arrow) Paint 2 Each 2 EA $25.00 <br />22. Pavement Message (Right Arrow) Paint 2 Each 2 EA $25.00 <br />23. Pavement Message (Only) Paint 4 Each 4 EA $40.00 <br />24. 2102.502 Pavement MarkingRemoval 660 l.in. Ft. 200 LF $0.50 <br />25. 2564.531 Furn. & Ir~t. Sign Panels,C 12.5 Sq. Ft. 50.75 SF $21.50 <br /> <br />$1,200.00 <br />$2,325.00 <br />$8,800.00 <br />$3,409.90 <br />$5,753.75 <br />$1,938.30 <br />$3,870.45 <br /> $1o0.00 <br /> $485.00 <br /> $140.00 <br /> $52.o0 <br /> $16o.o0 <br /> $330.00 <br />$4,530.00 <br />$2,125.00 <br />$3,332.50 <br /> $250.00 <br />$1,350.00 <br />$3,000.00 <br />$2,350.00 <br /> $50.o0 <br /> $50.o0 <br /> $160.00 <br /> $1o0.0o <br />$1,091.13 <br /> <br />TOTAL SCHEEt~LE "C" - STERN LANES ON T.H. 10 & 169: <br /> <br />$46,953.03 <br /> <br /> <br />