Laserfiche WebLink
"D"- ~AT~N/J~R ~0~ (~p. Proj. 89-14) <br /> <br /> Estimated <br /> Quantity <br /> <br /> Used Unit <br />To Date Price <br /> <br />Extension <br /> <br />i 6" DIP;CL52 890 <br /> 8" DIP;CL52 1075 <br /> Hydrants 5 <br />4. 6" Valves w/Box 7 <br />I 8" Valves w/Box 1 <br /> 8"x8"x8" Tee 1 <br />7. 8"x6"x8" Tee 2 <br />i 6"x6"x6" Tee 3 <br />8"x6" Cross 1 <br />. 8" Bends 4 <br />11. 6" Bends 3 <br />I 8" Plug 2 <br />6" Plug 2 <br />14. 1" Serv. Conn. (Corp., Curbstop & Box) 22 <br />I i. 1" Copper Service Pipe 870 <br />~. Pipe Foundation Rock 100 <br /> <br />LF 1680 LF $9.00 /LF <br />~ lOOO ~ $11.oo/~ <br />FA 8 FA $1,000.00 /FA <br />FA 12 FA $320.00 /EA <br />FA I FA $425.00/FA <br />FA 1 EA $120.00 /EA <br />FA 2 FA $115.00/FA <br />FA 7 FA $90.00 /FA <br />FA i FA $150.00 /FA <br />FA 4 FA $85.00 /FA <br />FA 2 FA $65.O0 /FA <br />FA 2 FA $30.00 /EA <br />FA 2 FA $25.00 /EA <br />FA 44 FA $70.00 /EA <br />LF 1610 LF $4.10 /LF <br />T 100 T $0.01 /~ <br /> <br />SCH~.rY3LE "D": <br /> <br /> "E"- STORM SEWER/JUNIPER WOODS (Imp. Proj. 89-14) <br /> <br />lem Estimated <br /> ~3__a_ntity <br /> <br /> Used Unit <br />To Date Price <br /> <br />$15,120.00 <br />$11,000.00 <br /> $8,000.00 <br /> $3,840.00 <br /> $425.00 <br /> $12o.oo <br /> $230.00 <br /> $630.00 <br /> $15o.oo <br /> $340.00 <br /> $130.00 <br /> $6o.oo <br /> $50.00 <br /> $3,080.00 <br /> $6,601.00 <br /> $1.oo <br /> <br />$49,777.00 <br /> <br />Extension <br /> <br /> 2503.511 12" RCPC3 -DepthVaries 160 <br /> 2503.511 15" RCPC3 - Depth Varies 334 <br /> Spec. 12" Conc. Pipe Plug 1 <br /> 2506.508 Catchbas~ol~ 4 <br /> 2506.509 Catchbasins 1 <br /> Spec.15"FlaredEndSec.w/Trashguard 1 <br />7. 2511.501 C3 Randc~nRiprap 3 <br /> 2501.511 15" CS Pipe Culvert 16ga. 65 <br /> 2501.515 15" CS Pipe Apron 2 <br />10. 2575.505 Sodding (Lawn & Blvd.) 150 <br />~! 2101.511 Clear & Grub (PondArea) 1 <br /> 2105.501 Common Excav. (Pond Area) 4500 <br /> 2575.555 (Por~dArea) Turf Estab. 1 <br /> . 2575.555 Turf Estab.(L2-10,B1,3rdAdd)_ 1 <br />. Pipe Foundation Rock 100 <br />. Co~m~on Borrow (Pond Area)* 2000 <br /> <br />rSCHEDULE "E": <br /> <br />*Per Change Order No. <br /> <br />~ 248 m $14.00/~ <br />LF 977 LF $15.00 /LF <br />FA 0 EA $40.00/EA <br />FA 6 EA $850.00/EA <br />FA 2 FA $600.00/FA <br />FA 2 FA $400.00/FA <br />CY 6 CY $40.00 /CY <br />LF 65 LF $14.00 /LF <br />FA 2 FA $65.00/Ek <br />sY o sY $2.0o/sY <br />IB 100%LS $3,832.22 /LS <br />CY 2650 CY $1.48 /CY <br />Is o Is $400.00/is <br />LS 0 IS $400.00 /IS <br />T 0 T $0.01/T <br />CY 2000 CY $2.00 /CY <br /> <br />$3,472.00 <br />$14,655.00 <br /> $o.oo <br /> $5,100.00 <br /> $1,200.00 <br /> $8oo.oo <br /> $240.00 <br /> $910.00 <br /> $13o.oo <br /> $o.oo <br /> $3,832.22 <br /> $3,922.00 <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $4,000.00 <br /> <br />$38,261.22 <br /> <br /> <br />