My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/03/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 12/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:36:22 AM
Creation date
12/2/2013 9:55:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/03/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Following construction, the ongoing traffic signal maintenance will be consistent with Anoka County <br />warranted traffic signal maintenance practices, with the County 100 % responsible for all ongoing traffic <br />signal maintenance, the City reimbursing the County 100% for all ongoing EVP maintenance, the City <br />100% responsible for all luminaire maintenance, and 100% responsible for the ongoing supply of <br />electrical power for the traffic signal system. <br />DRAINAGE: <br />The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins <br />and their outlet structures. The City portion of the cost is based on contributing flow through the storm <br />sewer system to the detention basin determined by the product of contributing area and runoff <br />coefficient. <br />TRAFFIC CONTROL: <br />The parties understand and agree that CSAH 5(Nowthen Blvd NW) and Alpine Drive will be closed to <br />thru traffic during construction. The parties agree and understand the cost share for traffic control for the <br />city shall be a prorated share based on the City project cost divided by the total project cost. <br />DRIVEWAYS: <br />The parties agree that all driveways affected by the Project will be reconstructed in kind at 100% project <br />cost with the cost of any upgrades requested by the City, including concrete aprons, to be the sole <br />responsibility of the City. <br />LANDSCAPING/STREETSCAPING: <br />The parties agree that if the City wishes to include landscaping or streetscape features in the County <br />right of way, they shall be designed in accordance with Anoka County Highway Department <br />Landscape/Streetscape Guidelines. The City shall supply the signed plan sheets and specifications for <br />the proposed landscape/streetscape. The total cost of the design as well as the construction cost above <br />standard median cost will be at the expense of the requesting City. All construction documents must be <br />submitted to the County by December 16, 2013. Maintenance of any landscaping/streetscaping will be <br />the sole responsibility of the City. <br />UTILITIES: <br />The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations. The <br />City will be responsible for the design of any sanitary sewer and water main improvements and/or <br />relocations due to road reconstruction, which will be incorporated into the project bid documents. The <br />cost of the design of these features shall be the responsibility of the City. The cost of construction of <br />these features shall be the responsibility of the City. In areas where relocations are solely due to road <br />reconstruction federal funds shall be applied. The City's design of the sanitary sewer and water main <br />utilities are to include signed plans, specifications, and estimated quantities and cost. All construction <br />documents must be submitted to the County by December 16, 2013. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.