My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/03/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 12/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:36:22 AM
Creation date
12/2/2013 9:55:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/03/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2014 thrii 2018 <br />City of Ramsey, Minnesota <br />Project # 12-STR-008 <br />Project Name Reconstruct Riverdale Drive to Tungston Street <br />Description <br />This project would reconstruct Riverdale Drive to Tungston Street <br />No Funding available at current time pushed out to 2017 to see what happens <br />Justification <br />Department Street Improvements <br />Contact <br />Type Improvement <br />Useful Life 25 <br />Category Street Improvement <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $1,350,000 <br />This project will reconstruct Riverdale Drive, grading the shoulder for a 10 foot bituminous trail which is part of the Mississippi River Trail grant <br />from the National Park Service. This project as scoped removes all bituminous and curb. Storm sewer will be installed to meet MSA spacing <br />guidelines. The curb will be replaced and new bituminous will be installed. This is an MSA route. <br />The roadway is scoped at two 12 foot driving lanes and two eight foot parking lanes. There could be cost savings through retaining the curb on one <br />side of the road, installed one 8 foot parking lane and replacing curb. <br />Expenditures <br />Improvements Other than Build <br />Total <br />Funding Sources <br />Public Improvement Revolving <br />Total <br />2014 2015 2016 2017 2018 Total <br />1,350,000 1,350,000 <br />1,350,000 1,350,000 <br />2014 2015 2016 2017 2018 Total <br />1,350,000 1,350,000 <br />1,350,000 1,350,000 <br />Revised 10/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.